cell_key,template_sheet,cellreference
Project/Programme Name,Introduction,C11
Department ,Introduction,C9
Delivery Body ,Introduction,C10
Stoogge value,Another Sheet,E26
DRRDD - IPA ID Number,Introduction,C12
Controls Project ID number,Introduction,C13
Jokey Entry,Introduction,A1
Parrots Name,Introduction,J9
Project Type (for IPA use),Introduction,C14
Classification,Introduction,C15
DRRDD (GMPP - formally joined GMPP),Introduction,C16
Reporting period (DRRDD - Snapshot Date),Introduction,C17
Snapshot Date,Introduction,C18
Senior Responsible Owner (SRO),Introduction,C21
Senior Responsible Owner (SRO) - Email,Introduction,C22
Senior Responsible Owner (SRO) - ID number,Introduction,C23
SRO Sign-Off,Introduction,C24
Project Director (PD),Introduction,C26
Project Director (PD) - Email,Introduction,C27
Project Director (PD) - ID number,Introduction,C28
Date Report Approved by PD?,Introduction,C29
Working Contact Name,Introduction,C31
Working Contact Email,Introduction,C32
Project Accountant with responsibility for Spend - Email,Introduction,C33
Project Benefits Mngr with responsibility for Benefits - Email,Introduction,C34
Project Planner with responsibility for Milestones - Email,Introduction,C35
IPA's Departmental Single Point of Contact,Introduction,C38
IPA's Departmental Single Point of Contact - Email,Introduction,C39
IPA Analysis & Insight Unit (AIU) Lead,Introduction,C40
IPA Analysis & Insight Unit (AIU) Lead - Email,Introduction,C41
Date Report Approved by AIU?,Introduction,C42
IPA Strategic Delivery Advisor (SDA) - Email,Introduction,C43
Date Report Approved by SDA?,Introduction,C44
Departmental PPM HoP copied in submission email?,Introduction,C46
Departmental PPM HoP - Email,Introduction,C47
Departmental HR HoP copied in submission email?,Introduction,C48
Departmental HR HoP - Email,Introduction,C49
Departmental Finance HoP copied in submission email?,Introduction,C50
Departmental Finance HoP - Email,Introduction,C51
Departmental Economics HoP copied in submission email?,Introduction,C52
Departmental Economics HoP - Email,Introduction,C53
Departmental Legal HoP copied in submission email?,Introduction,C54
Departmental Legal HoP - Email,Introduction,C55
Departmental Commercial l HoP copied in submission email?,Introduction,C56
Departmental Commercial HoP - Email,Introduction,C57
Departmental IT HoP copied in submission email?,Introduction,C58
Departmental IT HoP - Email,Introduction,C59
HMT Spending Team Lead copied in submission email?,Introduction,C60
HMT Spending Team Lead - Email,Introduction,C61
Quarter Joined,Introduction,C66
DFT ID Number,Introduction,C65
Working Contact Telephone,Introduction,C67
DfT Group,Introduction,C63
DfT Division,Introduction,C64
Brief project description (DRRDD - brief descripton),1 - Project Info,E6
DRRDD - Dept,1 - Project Info,E7
Agency or delivery partner (DRRDD - Delivery Organisation primary),1 - Project Info,E8
Delivery Organisation Secondary,1 - Project Info,E9
Project status,1 - Project Info,E10
Is the SRO for this project an MPLA Graduate?,1 - Project Info,E11
Is the PD for this project an MPLA Graduate?,1 - Project Info,E12
Does the Project have an issued SRO appointment letter?,1 - Project Info,E13
Has the SRO issued an appointment letter to the PD?,1 - Project Info,E14
Delivery Structure,1 - Project Info,E17
Change Delivery Methodology,1 - Project Info,E18
Delivery Narrative,1 - Project Info,E19
DN Type 1,1 - Project Info,D23
DN Description 1,1 - Project Info,E23
DN Type 2,1 - Project Info,D24
DN Description 2,1 - Project Info,E24
DN Type 3,1 - Project Info,D25
DN Description 3,1 - Project Info,E25
DN Type 4,1 - Project Info,D26
DN Description 4,1 - Project Info,E26
DN Type 5,1 - Project Info,D27
DN Description 5,1 - Project Info,E27
Primary Category,1 - Project Info,E30
Secondary Category,1 - Project Info,E31
Tertiary Category,1 - Project Info,E32
DRRDD Annual Report Category,1 - Project Info,E33
Significant Steel Requirement,1 - Project Info,E34
"For all construction, infrastructure or capital investment procurements >£10M, have you adopted the Government's Balanced Scorecard approach",1 - Project Info,E35
DRRDD - Main reason for joining GMPP,1 - Project Info,E36
Second reason for joining DRRDD (if applicable),1 - Project Info,E37
List Strategic Outcomes (DRRDD - Intended Outcome 1),1 - Project Info,D41
IO1,1 - Project Info,G41
IO1 - Monetised?,1 - Project Info,H41
IO1 PESTLE,1 - Project Info,J41
List Strategic Outcomes (DRRDD - Intended Outcome 2),1 - Project Info,D42
IO2,1 - Project Info,G42
IO2 - Monetised?,1 - Project Info,H42
IO2 PESTLE,1 - Project Info,J42
List Strategic Outcomes (DRRDD - Intended Outcome 3),1 - Project Info,D43
IO3,1 - Project Info,G43
IO3 - Monetised?,1 - Project Info,H43
IO3 PESTLE,1 - Project Info,J43
List Strategic Outcomes (DRRDD - Intended Outcome 4),1 - Project Info,D44
IO4,1 - Project Info,G44
IO4 - Monetised?,1 - Project Info,H44
IO4 PESTLE,1 - Project Info,J44
List Strategic Outcomes (DRRDD - Intended Outcome 5),1 - Project Info,D45
IO5,1 - Project Info,G45
IO5 - Monetised?,1 - Project Info,H45
IO5 PESTLE,1 - Project Info,J45
List Strategic Outcomes (DRRDD - Intended Outcome 6),1 - Project Info,D46
IO6,1 - Project Info,G46
IO6 - Monetised?,1 - Project Info,H46
IO6 PESTLE,1 - Project Info,J46
List Strategic Outcomes (DRRDD - Intended Outcome 7),1 - Project Info,D47
IO7,1 - Project Info,G47
IO7 - Monetised?,1 - Project Info,H47
IO7 PESTLE,1 - Project Info,J47
List Strategic Outcomes (DRRDD - Intended Outcome 8),1 - Project Info,D48
IO8,1 - Project Info,G48
IO8 - Monetised?,1 - Project Info,H48
IO8 PESTLE,1 - Project Info,J48
List Strategic Outcomes (DRRDD - Intended Outcome 9),1 - Project Info,D49
IO9,1 - Project Info,G49
IO9 - Monetised?,1 - Project Info,H49
IO9 PESTLE,1 - Project Info,J49
List Strategic Outcomes (DRRDD - Intended Outcome 10),1 - Project Info,D50
IO10,1 - Project Info,G50
IO10 - Monetised?,1 - Project Info,H50
IO10 PESTLE,1 - Project Info,J50
Primary investment Objective,1 - Project Info,E54
IO11 Monetised,1 - Project Info,K54
Secondary Investment Objective,1 - Project Info,E55
IO12 Monetised,1 - Project Info,K55
Is successful completion of this project dependent on another DRRDD project? ,1 - Project Info,E58
Dependency 1 - Department,1 - Project Info,E59
Dependency 1 - DRRDD Project,1 - Project Info,E60
Dependency 2 - Department,1 - Project Info,E61
Dependency 2 - DRRDD Project,1 - Project Info,E62
Dependency 3 - Department,1 - Project Info,E63
Dependency 3 - DRRDD Project,1 - Project Info,E64
Project Bobbins,1 - Project Info,E67
Departmental DCA,2 - DCA & Risk,E7
Departmental DCA Narrative,2 - DCA & Risk,E8
DRRDD - IPA DCA,2 - DCA & Risk,E10
DRRDD - IPA DCA Commentary,2 - DCA & Risk,E11
DRRDD - IPA DCA last quarter,2 - DCA & Risk,P10
Risk Level (RPA),2 - DCA & Risk,E12
Risk Level (RPA) Date,2 - DCA & Risk,E13
Brief Risk Decription 1,2 - DCA & Risk,D17
BRD 1Risk Category,2 - DCA & Risk,E17
BRD 1 Primary Risk to ,2 - DCA & Risk,G17
BRD 1 Internal Control,2 - DCA & Risk,I17
BRD 1 Residual Impact,2 - DCA & Risk,J17
BRD 1 Residual Likelihood,2 - DCA & Risk,K17
Brief Risk Decription 2,2 - DCA & Risk,D18
BRD 2 Risk Category,2 - DCA & Risk,E18
BRD 2 Primary Risk to ,2 - DCA & Risk,G18
BRD 2 Internal Control,2 - DCA & Risk,I18
BRD 2 Residual Impact,2 - DCA & Risk,J18
BRD 2 Residual Likelihood,2 - DCA & Risk,K18
Brief Risk Decription 3,2 - DCA & Risk,D19
BRD 3 Risk Category,2 - DCA & Risk,E19
BRD 3 Primary Risk to ,2 - DCA & Risk,G19
BRD 3 Internal Control,2 - DCA & Risk,I19
BRD 3 Residual Impact,2 - DCA & Risk,J19
BRD 3 Residual Likelihood,2 - DCA & Risk,K19
Brief Risk Decription 4,2 - DCA & Risk,D20
BRD 4 Risk Category,2 - DCA & Risk,E20
BRD 4 Primary Risk to ,2 - DCA & Risk,G20
BRD 4 Internal Control,2 - DCA & Risk,I20
BRD 4 Residual Impact,2 - DCA & Risk,J20
BRD 4 Residual Likelihood,2 - DCA & Risk,K20
Brief Risk Decription 5,2 - DCA & Risk,D21
BRD 5 Risk Category,2 - DCA & Risk,E21
BRD 5 Primary Risk to ,2 - DCA & Risk,G21
BRD 5 Internal Control,2 - DCA & Risk,I21
BRD 5 Residual Impact,2 - DCA & Risk,J21
BRD 5 Residual Likelihood,2 - DCA & Risk,K21
1st Bobbins Change - Description / Type,3 - Scope History,E6
SC1 Date Bobbins Change Implemented,3 - Scope History,E7
SC1 Date Implemented: Actual or Forecast?,3 - Bobbins History,K7
SC1 Impact on Project End Date?,3 - Bobbins History,E8
SC1 Is change in Project End Date solely due to the Bobbins change? ,3 - Scope History,E9
SC1 Impact on Costs?,3 - Bobbins History,E10
SC1 Is change in Costs solely due to the Bobbins change? ,3 - Scope History,E11
SC1 Impact on Intended Outcomes?,3 - Bobbins History,E12
SC1 Has the Business Case been updated as a result of this Bobbins change?,3 - Scope History,E13
"SC1 If Yes, new Business Case Type?",3 - Bobbins History,K14
SC1 New Business Case Version Number,3 - Bobbins History,E14
SC1 Has HMT approved this new business case?,3 - Bobbins History,E15
2nd Bobbins Change - Description / Type,3 - Scope History,E18
SC2 Date Bobbins Change Implemented,3 - Scope History,E19
SC2 Date Implemented: Actual or Forecast?,3 - Bobbins History,K19
SC2 Impact on Project End Date?,3 - Bobbins History,E20
SC2 Is change in Project End Date solely due to the Bobbins change? ,3 - Scope History,E21
SC2 Impact on Costs?,3 - Bobbins History,E22
SC2 Is change in Costs solely due to the Bobbins change? ,3 - Scope History,E23
SC2 Impact on Intended Outcomes?,3 - Bobbins History,E24
SC2 Has the Business Case been updated as a result of this Bobbins change?,3 - Scope History,E25
"SC2 If Yes, new Business Case Type?",3 - Bobbins History,E26
SC2 New Business Case Version Number,3 - Bobbins History,K26
SC2 Has HMT approved this new business case?,3 - Bobbins History,E27
3rd Bobbins Change - Description / Type,3 - Scope History,E30
SC3 Date Bobbins Change Implemented,3 - Scope History,E31
SC3 Date Implemented: Actual or Forecast?,3 - Bobbins History,K31
SC3 Impact on Project End Date?,3 - Bobbins History,E32
SC3 Is change in Project End Date solely due to the Bobbins change? ,3 - Scope History,E33
SC3 Impact on Costs?,3 - Bobbins History,E34
SC3 Is change in Costs solely due to the Bobbins change? ,3 - Scope History,E35
SC3 Impact on Intended Outcomes?,3 - Bobbins History,E36
SC3 Has the Business Case been updated as a result of this Bobbins change?,3 - Scope History,E37
"SC3 If Yes, new Business Case Type?",3 - Bobbins History,E38
SC3 New Business Case Version Number,3 - Bobbins History,K38
SC3 Has HMT approved this new business case?,3 - Bobbins History,E39
4th Bobbins Change - Description / Type,3 - Scope History,E42
SC4 Date Bobbins Change Implemented,3 - Scope History,E43
SC4 Date Implemented: Actual or Forecast?,3 - Bobbins History,K43
SC4 Impact on Project End Date?,3 - Bobbins History,E44
SC4 Is change in Project End Date solely due to the Bobbins change? ,3 - Scope History,E45
SC4 Impact on Costs?,3 - Bobbins History,E46
SC4 Is change in Costs solely due to the Bobbins change? ,3 - Scope History,E47
SC4 Impact on Intended Outcomes?,3 - Bobbins History,E48
SC4 Has the Business Case been updated as a result of this Bobbins change?,3 - Scope History,E49
"SC4 If Yes, new Business Case Type?",3 - Bobbins History,E50
SC4 New Business Case Version Number,3 - Bobbins History,K50
SC4 Has HMT approved this new business case?,3 - Bobbins History,E51
SRO Is this position currently filled?,4 - Leaders,E6
DRRDD - SRO ID,4 - Leaders,E7
SRO Last Name,4 - Leaders,E8
SRO First Name,4 - Leaders,E9
SRO Full Name,4 - Leaders,E10
SRO Email,4 - Leaders,E11
SRO Phone No.,4 - Leaders,E12
SRO Tenure Start Date,4 - Leaders,E13
SRO Tenure End Date,4 - Leaders,E14
SRO Length of tenure (years),4 - Leaders,E15
"If SRO Tenure End Date change, please advise reason",4 - Leaders,E16
Job Title / Grade,4 - Leaders,E17
SRO Grade,4 - Leaders,K17
SRO Career Anchor - Primary,4 - Leaders,E18
SRO Career Anchor - Secondary,4 - Leaders,E19
Percentage of time spent on SRO Role,4 - Leaders,E20
If new SRO reason for change,4 - Leaders,E21
"If there are further SROs, please name, and explain why?",4 - Leaders,E22
PD Is this position currently filled?,4 - Leaders,E25
DRRDD - PD ID,4 - Leaders,E26
PD Last Name,4 - Leaders,E27
PD First Name,4 - Leaders,E28
PD Full Name,4 - Leaders,E29
PD Email,4 - Leaders,E30
PD Phone No.,4 - Leaders,E31
PD Tenure Start Date,4 - Leaders,E32
PD Tenure End Date,4 - Leaders,E33
PD Length of tenure (years),4 - Leaders,E34
"If PD Tenure End Date change, please advise reason, and Type",4 - Leaders,E35
Job Title,4 - Leaders,E36
PD Grade,4 - Leaders,K36
PD Career Anchor - Primary,4 - Leaders,E37
PD Career Anchor - Secondary,4 - Leaders,E38
Percentage of time spent on PD Role,4 - Leaders,E39
If new PD reason for change,4 - Leaders,E40
Secondary PDs please name?,4 - Leaders,E41
No public sector employees working on the project,5 - People,E6
No external contractors working on the project,5 - People,E7
TOTAL Number working in the project team (FTEs),5 - People,E8
No employees funded to work on project,5 - People,E9
Total Number or vacancies on the project,5 - People,E10
Resource Gap (%),5 - People,E11
Project Team Turnover since last Quarter - Qualitative Assessment,5 - People,E12
Resources commentary,5 - People,E13
Digital - Now,5 - People,E17
Digital - Future,5 - People,G17
Digital Short Narrative (Amber or Red),5 - People,I17
Information Technology - Now,5 - People,E18
Information Technology - Future,5 - People,G18
Information Technology Short Narrative (Amber or Red),5 - People,I18
Legal Commercial Contract Management - Now,5 - People,E19
Legal Commercial Contract Management - Future,5 - People,G19
"Legal, Commercial & Contract Management Short Narrative (Amber or Red)",5 - People,I19
Project Delivery - Now,5 - People,E20
Project Delivery - Future,5 - People,G20
Project Delivery Short Narrative (Amber or Red),5 - People,I20
Change Implementation - Now,5 - People,E21
Change Implementation - Future,5 - People,G21
Change Implementation Short Narrative (Amber or Red),5 - People,I21
Technical - Now,5 - People,E22
Technical - Future,5 - People,G22
Technical Short Narrative (Amber or Red),5 - People,I22
Industry Knowledge - Now,5 - People,E23
Industry Knowledge - Future,5 - People,G23
Industry Knowledge Short Narrative (Amber or Red),5 - People,I23
Finance - Now,5 - People,E24
Finance - Future,5 - People,G24
Finance Short Narrative (Amber or Red),5 - People,I24
Analysis Now,5 - People,E25
Analysis - future,5 - People,G25
Analysis Short Narrative (Amber or Red),5 - People,I25
Communications & Stakeholder Engagement - Now,5 - People,E26
Communications & Stakeholder Engagement - Future,5 - People,G26
Communications & Stakeholder Engagement Short Narrative (Amber or Red),5 - People,I26
Additional Capability 1 Now,5 - People,E27
Additional Capability 1 Future,5 - People,G27
Additional Capability 1 Short Narrative (Amber or Red),5 - People,I27
Additional Capability 2 Now,5 - People,E28
Additional Capability 2 Future,5 - People,G28
Additional Capability 2 Short Narrative (Amber or Red),5 - People,I28
Other Capability 3 - Now,5 - People,E29
Other Capability 3 - Future,5 - People,G29
Additional Capability 3 Short Narrative (Amber or Red),5 - People,I29
Other Capability 4 - Now,5 - People,E30
Other Capability 4 - Future,5 - People,G30
Additional Capability 4 Short Narrative (Amber or Red),5 - People,I30
Additional Capability 5 Now,5 - People,E31
Additional Capability 5 Future,5 - People,G31
Additional Capability 5 Short Narrative (Amber or Red),5 - People,I31
Overall Resource DCA - Now,5 - People,E35
Overall Resource DCA - Future,5 - People,G35
Approval MM1,6a - Milestones - Approvals,D7
Approval MM1 Gov Type,6a - Milestones - Approvals,E7
Approval MM1 Ver No,6a - Milestones - Approvals,F7
Approval MM1 Original Bobline,6a - Milestones - Approvals,G7
Approval MM1 Forecast / Actual,6a - Milestones - Approvals,H7
Approval MM1 Variance,6a - Milestones - Approvals,I7
Approval MM1 Status,6a - Milestones - Approvals,J7
Approval MM1 Notes,6a - Milestones - Approvals,K7
Approval MM2,6a - Milestones - Approvals,D8
Approval MM2 Gov Type,6a - Milestones - Approvals,E8
Approval MM2 Ver No,6a - Milestones - Approvals,F8
Approval MM2 Original Bobline,6a - Milestones - Approvals,G8
Approval MM2 Forecast / Actual,6a - Milestones - Approvals,H8
Approval MM2 Variance,6a - Milestones - Approvals,I8
Approval MM2 Status,6a - Milestones - Approvals,J8
Approval MM2 Notes,6a - Milestones - Approvals,K8
Approval MM3,6a - Milestones - Approvals,D9
Approval MM3 Gov Type,6a - Milestones - Approvals,E9
Approval MM3 Ver No,6a - Milestones - Approvals,F9
Approval MM3 Original Bobline,6a - Milestones - Approvals,G9
Approval MM3 Forecast / Actual,6a - Milestones - Approvals,H9
Approval MM3 Variance,6a - Milestones - Approvals,I9
Approval MM3 Status,6a - Milestones - Approvals,J9
Approval MM3 Notes,6a - Milestones - Approvals,K9
Approval MM4,6a - Milestones - Approvals,D10
Approval MM4 Gov Type,6a - Milestones - Approvals,E10
Approval MM4 Ver No,6a - Milestones - Approvals,F10
Approval MM4 Original Bobline,6a - Milestones - Approvals,G10
Approval MM4 Forecast / Actual,6a - Milestones - Approvals,H10
Approval MM4 Variance,6a - Milestones - Approvals,I10
Approval MM4 Status,6a - Milestones - Approvals,J10
Approval MM4 Notes,6a - Milestones - Approvals,K10
Approval MM5,6a - Milestones - Approvals,D11
Approval MM5 Gov Type,6a - Milestones - Approvals,E11
Approval MM5 Ver No,6a - Milestones - Approvals,F11
Approval MM5 Original Bobline,6a - Milestones - Approvals,G11
Approval MM5 Forecast / Actual,6a - Milestones - Approvals,H11
Approval MM5 Variance,6a - Milestones - Approvals,I11
Approval MM5 Status,6a - Milestones - Approvals,J11
Approval MM5 Notes,6a - Milestones - Approvals,K11
Approval MM6,6a - Milestones - Approvals,D12
Approval MM6 Gov Type,6a - Milestones - Approvals,E12
Approval MM6 Ver No,6a - Milestones - Approvals,F12
Approval MM6 Original Bobline,6a - Milestones - Approvals,G12
Approval MM6 Forecast / Actual,6a - Milestones - Approvals,H12
Approval MM6 Variance,6a - Milestones - Approvals,I12
Approval MM6 Status,6a - Milestones - Approvals,J12
Approval MM6 Notes,6a - Milestones - Approvals,K12
Approval MM7,6a - Milestones - Approvals,D13
Approval MM7 Gov Type,6a - Milestones - Approvals,E13
Approval MM7 Ver No,6a - Milestones - Approvals,F13
Approval MM7 Original Bobline,6a - Milestones - Approvals,G13
Approval MM7 Forecast / Actual,6a - Milestones - Approvals,H13
Approval MM7 Variance,6a - Milestones - Approvals,I13
Approval MM7 Status,6a - Milestones - Approvals,J13
Approval MM7 Notes,6a - Milestones - Approvals,K13
Approval MM8,6a - Milestones - Approvals,D14
Approval MM8 Gov Type,6a - Milestones - Approvals,E14
Approval MM8 Ver No,6a - Milestones - Approvals,F14
Approval MM8 Original Bobline,6a - Milestones - Approvals,G14
Approval MM8 Forecast / Actual,6a - Milestones - Approvals,H14
Approval MM8 Variance,6a - Milestones - Approvals,I14
Approval MM8 Status,6a - Milestones - Approvals,J14
Approval MM8 Notes,6a - Milestones - Approvals,K14
Approval MM9,6a - Milestones - Approvals,D15
Approval MM9 Gov Type,6a - Milestones - Approvals,E15
Approval MM9 Ver No,6a - Milestones - Approvals,F15
Approval MM9 Original Bobline,6a - Milestones - Approvals,G15
Approval MM9 Forecast / Actual,6a - Milestones - Approvals,H15
Approval MM9 Variance,6a - Milestones - Approvals,I15
Approval MM9 Status,6a - Milestones - Approvals,J15
Approval MM9 Notes,6a - Milestones - Approvals,K15
Approval MM10,6a - Milestones - Approvals,D16
Approval MM10 Gov Type,6a - Milestones - Approvals,E16
Approval MM10 Ver No,6a - Milestones - Approvals,F16
Approval MM10 Original Bobline,6a - Milestones - Approvals,G16
Approval MM10 Forecast / Actual,6a - Milestones - Approvals,H16
Approval MM10 Variance,6a - Milestones - Approvals,I16
Approval MM10 Status,6a - Milestones - Approvals,J16
Approval MM10 Notes,6a - Milestones - Approvals,K16
Approval MM11,6a - Milestones - Approvals,D17
Approval MM11 Gov Type,6a - Milestones - Approvals,E17
Approval MM11 Ver No,6a - Milestones - Approvals,F17
Approval MM11 Original Bobline,6a - Milestones - Approvals,G17
Approval MM11 Forecast / Actual,6a - Milestones - Approvals,H17
Approval MM11 Variance,6a - Milestones - Approvals,I17
Approval MM11 Status,6a - Milestones - Approvals,J17
Approval MM11 Notes,6a - Milestones - Approvals,K17
Approval MM12,6a - Milestones - Approvals,D18
Approval MM12 Gov Type,6a - Milestones - Approvals,E18
Approval MM12 Ver No,6a - Milestones - Approvals,F18
Approval MM12 Original Bobline,6a - Milestones - Approvals,G18
Approval MM12 Forecast / Actual,6a - Milestones - Approvals,H18
Approval MM12 Variance,6a - Milestones - Approvals,I18
Approval MM12 Status,6a - Milestones - Approvals,J18
Approval MM12 Notes,6a - Milestones - Approvals,K18
Approval MM13,6a - Milestones - Approvals,D19
Approval MM13 Gov Type,6a - Milestones - Approvals,E19
Approval MM13 Ver No,6a - Milestones - Approvals,F19
Approval MM13 Original Bobline,6a - Milestones - Approvals,G19
Approval MM13 Forecast - Actual,6a - Milestones - Approvals,H19
Approval MM13 Variance,6a - Milestones - Approvals,I19
Approval MM13 Status,6a - Milestones - Approvals,J19
Approval MM13 Notes,6a - Milestones - Approvals,K19
Approval MM14,6a - Milestones - Approvals,D20
Approval MM14 Gov Type,6a - Milestones - Approvals,E20
Approval MM14 Ver No,6a - Milestones - Approvals,F20
Approval MM14 Original Bobline,6a - Milestones - Approvals,G20
Approval MM14 Forecast - Actual,6a - Milestones - Approvals,H20
Approval MM14 Variance,6a - Milestones - Approvals,I20
Approval MM14 Status,6a - Milestones - Approvals,J20
Approval MM14 Notes,6a - Milestones - Approvals,K20
Approval MM15,6a - Milestones - Approvals,D21
Approval MM15 Gov Type,6a - Milestones - Approvals,E21
Approval MM15 Ver No,6a - Milestones - Approvals,F21
Approval MM15 Original Bobline,6a - Milestones - Approvals,G21
Approval MM15 Forecast - Actual,6a - Milestones - Approvals,H21
Approval MM15 Variance,6a - Milestones - Approvals,I21
Approval MM15 Status,6a - Milestones - Approvals,J21
Approval MM15 Notes,6a - Milestones - Approvals,K21
Approval MM16,6a - Milestones - Approvals,D22
Approval MM16 Gov Type,6a - Milestones - Approvals,E22
Approval MM16 Ver No,6a - Milestones - Approvals,F22
Approval MM16 Original Bobline,6a - Milestones - Approvals,G22
Approval MM16 Forecast - Actual,6a - Milestones - Approvals,H22
Approval MM16 Variance,6a - Milestones - Approvals,I22
Approval MM16 Status,6a - Milestones - Approvals,J22
Approval MM16 Notes,6a - Milestones - Approvals,K22
Approval MM17,6a - Milestones - Approvals,D23
Approval MM17 Gov Type,6a - Milestones - Approvals,E23
Approval MM17 Ver No,6a - Milestones - Approvals,F23
Approval MM17 Original Bobline,6a - Milestones - Approvals,G23
Approval MM17 Forecast / Actual,6a - Milestones - Approvals,H23
Approval MM17 Variance,6a - Milestones - Approvals,I23
Approval MM17 Status,6a - Milestones - Approvals,J23
Approval MM17 Notes,6a - Milestones - Approvals,K23
Approval MM18,6a - Milestones - Approvals,D24
Approval MM18 Gov Type,6a - Milestones - Approvals,E24
Approval MM18 Ver No,6a - Milestones - Approvals,F24
Approval MM18 Original Bobline,6a - Milestones - Approvals,G24
Approval MM18 Forecast / Actual,6a - Milestones - Approvals,H24
Approval MM18 Variance,6a - Milestones - Approvals,I24
Approval MM18 Status,6a - Milestones - Approvals,J24
Approval MM18 Notes,6a - Milestones - Approvals,K24
Approval MM19,6a - Milestones - Approvals,D25
Approval MM19 Gov Type,6a - Milestones - Approvals,E25
Approval MM19 Ver No,6a - Milestones - Approvals,F25
Approval MM19 Original Bobline,6a - Milestones - Approvals,G25
Approval MM19 Forecast / Actual,6a - Milestones - Approvals,H25
Approval MM19 Variance,6a - Milestones - Approvals,I25
Approval MM19 Status,6a - Milestones - Approvals,J25
Approval MM19 Notes,6a - Milestones - Approvals,K25
Approval MM20,6a - Milestones - Approvals,D26
Approval MM20 Gov Type,6a - Milestones - Approvals,E26
Approval MM20 Ver No,6a - Milestones - Approvals,F26
Approval MM20 Original Bobline,6a - Milestones - Approvals,G26
Approval MM20 Forecast / Actual,6a - Milestones - Approvals,H26
Approval MM20 Variance,6a - Milestones - Approvals,I26
Approval MM20 Status,6a - Milestones - Approvals,J26
Approval MM20 Notes,6a - Milestones - Approvals,K26
Approval MM21,6a - Milestones - Approvals,D27
Approval MM21 Gov Type,6a - Milestones - Approvals,E27
Approval MM21 Ver No,6a - Milestones - Approvals,F27
Approval MM21 Original Bobline,6a - Milestones - Approvals,G27
Approval MM21 Forecast / Actual,6a - Milestones - Approvals,H27
Approval MM21 Variance,6a - Milestones - Approvals,I27
Approval MM21 Status,6a - Milestones - Approvals,J27
Approval MM21 Notes,6a - Milestones - Approvals,K27
Approval MM22,6a - Milestones - Approvals,D28
Approval MM22 Gov Type,6a - Milestones - Approvals,E28
Approval MM22 Ver No,6a - Milestones - Approvals,F28
Approval MM22 Original Bobline,6a - Milestones - Approvals,G28
Approval MM22 Forecast / Actual,6a - Milestones - Approvals,H28
Approval MM22 Variance,6a - Milestones - Approvals,I28
Approval MM22 Status,6a - Milestones - Approvals,J28
Approval MM22 Notes,6a - Milestones - Approvals,K28
Approval MM23,6a - Milestones - Approvals,D29
Approval MM23 Gov Type,6a - Milestones - Approvals,E29
Approval MM23 Ver No,6a - Milestones - Approvals,F29
Approval MM23 Original Bobline,6a - Milestones - Approvals,G29
Approval MM23 Forecast / Actual,6a - Milestones - Approvals,H29
Approval MM23 Variance,6a - Milestones - Approvals,I29
Approval MM23 Status,6a - Milestones - Approvals,J29
Approval MM23 Notes,6a - Milestones - Approvals,K29
Approval MM24,6a - Milestones - Approvals,D30
Approval MM24 Gov Type,6a - Milestones - Approvals,E30
Approval MM24 Ver No,6a - Milestones - Approvals,F30
Approval MM24 Original Bobline,6a - Milestones - Approvals,G30
Approval MM24 Forecast / Actual,6a - Milestones - Approvals,H30
Approval MM24 Variance,6a - Milestones - Approvals,I30
Approval MM24 Status,6a - Milestones - Approvals,J30
Approval MM24 Notes,6a - Milestones - Approvals,K30
Approval MM25,6a - Milestones - Approvals,D31
Approval MM25 Gov Type,6a - Milestones - Approvals,E31
Approval MM25 Ver No,6a - Milestones - Approvals,F31
Approval MM25 Original Bobline,6a - Milestones - Approvals,G31
Approval MM25 Forecast / Actual,6a - Milestones - Approvals,H31
Approval MM25 Variance,6a - Milestones - Approvals,I31
Approval MM25 Status,6a - Milestones - Approvals,J31
Approval MM25 Notes,6a - Milestones - Approvals,K31
Approval MM26,6a - Milestones - Approvals,D32
Approval MM26 Gov Type,6a - Milestones - Approvals,E32
Approval MM26 Ver No,6a - Milestones - Approvals,F32
Approval MM26 Original Bobline,6a - Milestones - Approvals,G32
Approval MM26 Forecast / Actual,6a - Milestones - Approvals,H32
Approval MM26 Variance,6a - Milestones - Approvals,I32
Approval MM26 Status,6a - Milestones - Approvals,J32
Approval MM26 Notes,6a - Milestones - Approvals,K32
Approval MM27,6a - Milestones - Approvals,D33
Approval MM27 Gov Type,6a - Milestones - Approvals,E33
Approval MM27 Ver No,6a - Milestones - Approvals,F33
Approval MM27 Original Bobline,6a - Milestones - Approvals,G33
Approval MM27 Forecast / Actual,6a - Milestones - Approvals,H33
Approval MM27 Variance,6a - Milestones - Approvals,I33
Approval MM27 Status,6a - Milestones - Approvals,J33
Approval MM27 Notes,6a - Milestones - Approvals,K33
Approval MM28,6a - Milestones - Approvals,D34
Approval MM28 Gov Type,6a - Milestones - Approvals,E34
Approval MM28 Ver No,6a - Milestones - Approvals,F34
Approval MM28 Original Bobline,6a - Milestones - Approvals,G34
Approval MM28 Forecast / Actual,6a - Milestones - Approvals,H34
Approval MM28 Variance,6a - Milestones - Approvals,I34
Approval MM28 Status,6a - Milestones - Approvals,J34
Approval MM28 Notes,6a - Milestones - Approvals,K34
Approval MM29,6a - Milestones - Approvals,D35
Approval MM29 Gov Type,6a - Milestones - Approvals,E35
Approval MM29 Ver No,6a - Milestones - Approvals,F35
Approval MM29 Original Bobline,6a - Milestones - Approvals,G35
Approval MM29 Forecast / Actual,6a - Milestones - Approvals,H35
Approval MM29 Variance,6a - Milestones - Approvals,I35
Approval MM29 Status,6a - Milestones - Approvals,J35
Approval MM29 Notes,6a - Milestones - Approvals,K35
Approval MM30,6a - Milestones - Approvals,D36
Approval MM30 Gov Type,6a - Milestones - Approvals,E36
Approval MM30 Ver No,6a - Milestones - Approvals,F36
Approval MM30 Original Bobline,6a - Milestones - Approvals,G36
Approval MM30 Forecast / Actual,6a - Milestones - Approvals,H36
Approval MM30 Variance,6a - Milestones - Approvals,I36
Approval MM30 Status,6a - Milestones - Approvals,J36
Approval MM30 Notes,6a - Milestones - Approvals,K36
Approval MM31,6a - Milestones - Approvals,D37
Approval MM31 Gov Type,6a - Milestones - Approvals,E37
Approval MM31 Ver No,6a - Milestones - Approvals,F37
Approval MM31 Original Bobline,6a - Milestones - Approvals,G37
Approval MM31 Forecast / Actual,6a - Milestones - Approvals,H37
Approval MM31 Variance,6a - Milestones - Approvals,I37
Approval MM31 Status,6a - Milestones - Approvals,J37
Approval MM31 Notes,6a - Milestones - Approvals,K37
Approval MM32,6a - Milestones - Approvals,D38
Approval MM32 Gov Type,6a - Milestones - Approvals,E38
Approval MM32 Ver No,6a - Milestones - Approvals,F38
Approval MM32 Original Bobline,6a - Milestones - Approvals,G38
Approval MM32 Forecast / Actual,6a - Milestones - Approvals,H38
Approval MM32 Variance,6a - Milestones - Approvals,I38
Approval MM32 Status,6a - Milestones - Approvals,J38
Approval MM32 Notes,6a - Milestones - Approvals,K38
Approval MM33,6a - Milestones - Approvals,D39
Approval MM33 Gov Type,6a - Milestones - Approvals,E39
Approval MM33 Ver No,6a - Milestones - Approvals,F39
Approval MM33 Original Bobline,6a - Milestones - Approvals,G39
Approval MM33 Forecast / Actual,6a - Milestones - Approvals,H39
Approval MM33 Variance,6a - Milestones - Approvals,I39
Approval MM33 Status,6a - Milestones - Approvals,J39
Approval MM33 Notes,6a - Milestones - Approvals,K39
Approval MM34,6a - Milestones - Approvals,D40
Approval MM34 Gov Type,6a - Milestones - Approvals,E40
Approval MM34 Ver No,6a - Milestones - Approvals,F40
Approval MM34 Original Bobline,6a - Milestones - Approvals,G40
Approval MM34 Forecast / Actual,6a - Milestones - Approvals,H40
Approval MM34 Variance,6a - Milestones - Approvals,I40
Approval MM34 Status,6a - Milestones - Approvals,J40
Approval MM34 Notes,6a - Milestones - Approvals,K40
Approval MM35,6a - Milestones - Approvals,D41
Approval MM35 Gov Type,6a - Milestones - Approvals,E41
Approval MM35 Ver No,6a - Milestones - Approvals,F41
Approval MM35 Original Bobline,6a - Milestones - Approvals,G41
Approval MM35 Forecast / Actual,6a - Milestones - Approvals,H41
Approval MM35 Variance,6a - Milestones - Approvals,I41
Approval MM35 Status,6a - Milestones - Approvals,J41
Approval MM35 Notes,6a - Milestones - Approvals,K41
Approval MM36,6a - Milestones - Approvals,D42
Approval MM36 Gov Type,6a - Milestones - Approvals,E42
Approval MM36 Ver No,6a - Milestones - Approvals,F42
Approval MM36 Original Bobline,6a - Milestones - Approvals,G42
Approval MM36 Forecast / Actual,6a - Milestones - Approvals,H42
Approval MM36 Variance,6a - Milestones - Approvals,I42
Approval MM36 Status,6a - Milestones - Approvals,J42
Approval MM36 Notes,6a - Milestones - Approvals,K42
Approval MM37,6a - Milestones - Approvals,D43
Approval MM37 Gov Type,6a - Milestones - Approvals,E43
Approval MM37 Ver No,6a - Milestones - Approvals,F43
Approval MM37 Original Bobline,6a - Milestones - Approvals,G43
Approval MM37 Forecast / Actual,6a - Milestones - Approvals,H43
Approval MM37 Variance,6a - Milestones - Approvals,I43
Approval MM37 Status,6a - Milestones - Approvals,J43
Approval MM37 Notes,6a - Milestones - Approvals,K43
Approval MM38,6a - Milestones - Approvals,D44
Approval MM38 Gov Type,6a - Milestones - Approvals,E44
Approval MM38 Ver No,6a - Milestones - Approvals,F44
Approval MM38 Original Bobline,6a - Milestones - Approvals,G44
Approval MM38 Forecast / Actual,6a - Milestones - Approvals,H44
Approval MM38 Variance,6a - Milestones - Approvals,I44
Approval MM38 Status,6a - Milestones - Approvals,J44
Approval MM38 Notes,6a - Milestones - Approvals,K44
Approval MM39,6a - Milestones - Approvals,D45
Approval MM39 Gov Type,6a - Milestones - Approvals,E45
Approval MM39 Ver No,6a - Milestones - Approvals,F45
Approval MM39 Original Bobline,6a - Milestones - Approvals,G45
Approval MM39 Forecast / Actual,6a - Milestones - Approvals,H45
Approval MM39 Variance,6a - Milestones - Approvals,I45
Approval MM39 Status,6a - Milestones - Approvals,J45
Approval MM39 Notes,6a - Milestones - Approvals,K45
Approval MM40,6a - Milestones - Approvals,D46
Approval MM40 Gov Type,6a - Milestones - Approvals,E46
Approval MM40 Ver No,6a - Milestones - Approvals,F46
Approval MM40 Original Bobline,6a - Milestones - Approvals,G46
Approval MM40 Forecast / Actual,6a - Milestones - Approvals,H46
Approval MM40 Variance,6a - Milestones - Approvals,I46
Approval MM40 Status,6a - Milestones - Approvals,J46
Approval MM40 Notes,6a - Milestones - Approvals,K46
Approval MM41,6a - Milestones - Approvals,D47
Approval MM41 Gov Type,6a - Milestones - Approvals,E47
Approval MM41 Ver No,6a - Milestones - Approvals,F47
Approval MM41 Original Bobline,6a - Milestones - Approvals,G47
Approval MM41 Forecast / Actual,6a - Milestones - Approvals,H47
Approval MM41 Variance,6a - Milestones - Approvals,I47
Approval MM41 Status,6a - Milestones - Approvals,J47
Approval MM41 Notes,6a - Milestones - Approvals,K47
Approval MM42,6a - Milestones - Approvals,D48
Approval MM42 Gov Type,6a - Milestones - Approvals,E48
Approval MM42 Ver No,6a - Milestones - Approvals,F48
Approval MM42 Original Bobline,6a - Milestones - Approvals,G48
Approval MM42 Forecast / Actual,6a - Milestones - Approvals,H48
Approval MM42 Variance,6a - Milestones - Approvals,I48
Approval MM42 Status,6a - Milestones - Approvals,J48
Approval MM42 Notes,6a - Milestones - Approvals,K48
Approval MM43,6a - Milestones - Approvals,D49
Approval MM43 Gov Type,6a - Milestones - Approvals,E49
Approval MM43 Ver No,6a - Milestones - Approvals,F49
Approval MM43 Original Bobline,6a - Milestones - Approvals,G49
Approval MM43 Forecast / Actual,6a - Milestones - Approvals,H49
Approval MM43 Variance,6a - Milestones - Approvals,I49
Approval MM43 Status,6a - Milestones - Approvals,J49
Approval MM43 Notes,6a - Milestones - Approvals,K49
Approval MM44,6a - Milestones - Approvals,D50
Approval MM44 Gov Type,6a - Milestones - Approvals,E50
Approval MM44 Ver No,6a - Milestones - Approvals,F50
Approval MM44 Original Bobline,6a - Milestones - Approvals,G50
Approval MM44 Forecast / Actual,6a - Milestones - Approvals,H50
Approval MM44 Variance,6a - Milestones - Approvals,I50
Approval MM44 Status,6a - Milestones - Approvals,J50
Approval MM44 Notes,6a - Milestones - Approvals,K50
Approval MM45,6a - Milestones - Approvals,D51
Approval MM45 Gov Type,6a - Milestones - Approvals,E51
Approval MM45 Ver No,6a - Milestones - Approvals,F51
Approval MM45 Original Bobline,6a - Milestones - Approvals,G51
Approval MM45 Forecast / Actual,6a - Milestones - Approvals,H51
Approval MM45 Variance,6a - Milestones - Approvals,I51
Approval MM45 Status,6a - Milestones - Approvals,J51
Approval MM45 Notes,6a - Milestones - Approvals,K51
Approval MM46,6a - Milestones - Approvals,D52
Approval MM46 Gov Type,6a - Milestones - Approvals,E52
Approval MM46 Ver No,6a - Milestones - Approvals,F52
Approval MM46 Original Bobline,6a - Milestones - Approvals,G52
Approval MM46 Forecast / Actual,6a - Milestones - Approvals,H52
Approval MM46 Variance,6a - Milestones - Approvals,I52
Approval MM46 Status,6a - Milestones - Approvals,J52
Approval MM46 Notes,6a - Milestones - Approvals,K52
Approval MM47,6a - Milestones - Approvals,D53
Approval MM47 Gov Type,6a - Milestones - Approvals,E53
Approval MM47 Ver No,6a - Milestones - Approvals,F53
Approval MM47 Original Bobline,6a - Milestones - Approvals,G53
Approval MM47 Forecast / Actual,6a - Milestones - Approvals,H53
Approval MM47 Variance,6a - Milestones - Approvals,I53
Approval MM47 Status,6a - Milestones - Approvals,J53
Approval MM47 Notes,6a - Milestones - Approvals,K53
Approval MM48,6a - Milestones - Approvals,D54
Approval MM48 Gov Type,6a - Milestones - Approvals,E54
Approval MM48 Ver No,6a - Milestones - Approvals,F54
Approval MM48 Original Bobline,6a - Milestones - Approvals,G54
Approval MM48 Forecast / Actual,6a - Milestones - Approvals,H54
Approval MM48 Variance,6a - Milestones - Approvals,I54
Approval MM48 Status,6a - Milestones - Approvals,J54
Approval MM48 Notes,6a - Milestones - Approvals,K54
Approval MM49,6a - Milestones - Approvals,D55
Approval MM49 Gov Type,6a - Milestones - Approvals,E55
Approval MM49 Ver No,6a - Milestones - Approvals,F55
Approval MM49 Original Bobline,6a - Milestones - Approvals,G55
Approval MM49 Forecast / Actual,6a - Milestones - Approvals,H55
Approval MM49 Variance,6a - Milestones - Approvals,I55
Approval MM49 Status,6a - Milestones - Approvals,J55
Approval MM49 Notes,6a - Milestones - Approvals,K55
Approval MM50,6a - Milestones - Approvals,D56
Approval MM50 Gov Type,6a - Milestones - Approvals,E56
Approval MM50 Ver No,6a - Milestones - Approvals,F56
Approval MM50 Original Bobline,6a - Milestones - Approvals,G56
Approval MM50 Forecast / Actual,6a - Milestones - Approvals,H56
Approval MM50 Variance,6a - Milestones - Approvals,I56
Approval MM50 Status,6a - Milestones - Approvals,J56
Approval MM50 Notes,6a - Milestones - Approvals,K56
BICC approval point,6a - Milestones - Approvals,F113
Assurance MM1,6b - Milestones - Assurance,D7
Assurance MM1 LoD,6b - Milestones - Assurance,E7
Assurance MM1 Original Bobline,6b - Milestones - Assurance,F7
Assurance MM1 Forecast - Actual,6b - Milestones - Assurance,G7
Assurance MM1 Variance,6b - Milestones - Assurance,H7
Assurance MM1 Status,6b - Milestones - Assurance,I7
Assurance MM1 Notes,6b - Milestones - Assurance,J7
Assurance MM2,6b - Milestones - Assurance,D8
Assurance MM2 LoD,6b - Milestones - Assurance,E8
Assurance MM2 Original Bobline,6b - Milestones - Assurance,F8
Assurance MM2 Forecast - Actual,6b - Milestones - Assurance,G8
Assurance MM2 Variance,6b - Milestones - Assurance,H8
Assurance MM2 Status,6b - Milestones - Assurance,I8
Assurance MM2 Notes,6b - Milestones - Assurance,J8
Assurance MM3,6b - Milestones - Assurance,D9
Assurance MM3 LoD,6b - Milestones - Assurance,E9
Assurance MM3 Original Bobline,6b - Milestones - Assurance,F9
Assurance MM3 Forecast - Actual,6b - Milestones - Assurance,G9
Assurance MM3 Variance,6b - Milestones - Assurance,H9
Assurance MM3 Status,6b - Milestones - Assurance,I9
Assurance MM3 Notes,6b - Milestones - Assurance,J9
Assurance MM4,6b - Milestones - Assurance,D10
Assurance MM4 LoD,6b - Milestones - Assurance,E10
Assurance MM4 Original Bobline,6b - Milestones - Assurance,F10
Assurance MM4 Forecast - Actual,6b - Milestones - Assurance,G10
Assurance MM4 Variance,6b - Milestones - Assurance,H10
Assurance MM4 Status,6b - Milestones - Assurance,I10
Assurance MM4 Notes,6b - Milestones - Assurance,J10
Assurance MM5,6b - Milestones - Assurance,D11
Assurance MM5 LoD,6b - Milestones - Assurance,E11
Assurance MM5 Original Bobline,6b - Milestones - Assurance,F11
Assurance MM5 Forecast - Actual,6b - Milestones - Assurance,G11
Assurance MM5 Variance,6b - Milestones - Assurance,H11
Assurance MM5 Status,6b - Milestones - Assurance,I11
Assurance MM5 Notes,6b - Milestones - Assurance,J11
Assurance MM6,6b - Milestones - Assurance,D12
Assurance MM6 LoD,6b - Milestones - Assurance,E12
Assurance MM6 Original Bobline,6b - Milestones - Assurance,F12
Assurance MM6 Forecast - Actual,6b - Milestones - Assurance,G12
Assurance MM6 Variance,6b - Milestones - Assurance,H12
Assurance MM6 Status,6b - Milestones - Assurance,I12
Assurance MM6 Notes,6b - Milestones - Assurance,J12
Assurance MM7,6b - Milestones - Assurance,D13
Assurance MM7 LoD,6b - Milestones - Assurance,E13
Assurance MM7 Original Bobline,6b - Milestones - Assurance,F13
Assurance MM7 Forecast - Actual,6b - Milestones - Assurance,G13
Assurance MM7 Variance,6b - Milestones - Assurance,H13
Assurance MM7 Status,6b - Milestones - Assurance,I13
Assurance MM7 Notes,6b - Milestones - Assurance,J13
Assurance MM8,6b - Milestones - Assurance,D14
Assurance MM8 LoD,6b - Milestones - Assurance,E14
Assurance MM8 Original Bobline,6b - Milestones - Assurance,F14
Assurance MM8 Forecast - Actual,6b - Milestones - Assurance,G14
Assurance MM8 Variance,6b - Milestones - Assurance,H14
Assurance MM8 Status,6b - Milestones - Assurance,I14
Assurance MM8 Notes,6b - Milestones - Assurance,J14
Assurance MM9,6b - Milestones - Assurance,D15
Assurance MM9 LoD,6b - Milestones - Assurance,E15
Assurance MM9 Original Bobline,6b - Milestones - Assurance,F15
Assurance MM9 Forecast - Actual,6b - Milestones - Assurance,G15
Assurance MM9 Variance,6b - Milestones - Assurance,H15
Assurance MM9 Status,6b - Milestones - Assurance,I15
Assurance MM9 Notes,6b - Milestones - Assurance,J15
Assurance MM10,6b - Milestones - Assurance,D16
Assurance MM10 LoD,6b - Milestones - Assurance,E16
Assurance MM10 Original Bobline,6b - Milestones - Assurance,F16
Assurance MM10 Forecast - Actual,6b - Milestones - Assurance,G16
Assurance MM10 Variance,6b - Milestones - Assurance,H16
Assurance MM10 Status,6b - Milestones - Assurance,I16
Assurance MM10 Notes,6b - Milestones - Assurance,J16
Assurance MM11,6b - Milestones - Assurance,D17
Assurance MM11 LoD,6b - Milestones - Assurance,E17
Assurance MM11 Original Bobline,6b - Milestones - Assurance,F17
Assurance MM11 Forecast - Actual,6b - Milestones - Assurance,G17
Assurance MM11 Variance,6b - Milestones - Assurance,H17
Assurance MM11 Status,6b - Milestones - Assurance,I17
Assurance MM11 Notes,6b - Milestones - Assurance,J17
Assurance MM12,6b - Milestones - Assurance,D18
Assurance MM12 LoD,6b - Milestones - Assurance,E18
Assurance MM12 Original Bobline,6b - Milestones - Assurance,F18
Assurance MM12 Forecast - Actual,6b - Milestones - Assurance,G18
Assurance MM12 Variance,6b - Milestones - Assurance,H18
Assurance MM12 Status,6b - Milestones - Assurance,I18
Assurance MM12 Notes,6b - Milestones - Assurance,J18
Assurance MM13,6b - Milestones - Assurance,D19
Assurance MM13 LoD,6b - Milestones - Assurance,E19
Assurance MM13 Original Bobline,6b - Milestones - Assurance,F19
Assurance MM13 Forecast - Actual,6b - Milestones - Assurance,G19
Assurance MM13 Variance,6b - Milestones - Assurance,H19
Assurance MM13 Status,6b - Milestones - Assurance,I19
Assurance MM13 Notes,6b - Milestones - Assurance,J19
Assurance MM14,6b - Milestones - Assurance,D20
Assurance MM14 LoD,6b - Milestones - Assurance,E20
Assurance MM14 Original Bobline,6b - Milestones - Assurance,F20
Assurance MM14 Forecast - Actual,6b - Milestones - Assurance,G20
Assurance MM14 Variance,6b - Milestones - Assurance,H20
Assurance MM14 Status,6b - Milestones - Assurance,I20
Assurance MM14 Notes,6b - Milestones - Assurance,J20
Assurance MM15,6b - Milestones - Assurance,D21
Assurance MM15 LoD,6b - Milestones - Assurance,E21
Assurance MM15 Original Bobline,6b - Milestones - Assurance,F21
Assurance MM15 Forecast - Actual,6b - Milestones - Assurance,G21
Assurance MM15 Variance,6b - Milestones - Assurance,H21
Assurance MM15 Status,6b - Milestones - Assurance,I21
Assurance MM15 Notes,6b - Milestones - Assurance,J21
Assurance MM16,6b - Milestones - Assurance,D22
Assurance MM16 LoD,6b - Milestones - Assurance,E22
Assurance MM16 Original Bobline,6b - Milestones - Assurance,F22
Assurance MM16 Forecast - Actual,6b - Milestones - Assurance,G22
Assurance MM16 Variance,6b - Milestones - Assurance,H22
Assurance MM16 Status,6b - Milestones - Assurance,I22
Assurance MM16 Notes,6b - Milestones - Assurance,J22
Assurance MM17,6b - Milestones - Assurance,D23
Assurance MM17 LoD,6b - Milestones - Assurance,E23
Assurance MM17 Original Bobline,6b - Milestones - Assurance,F23
Assurance MM17 Forecast - Actual,6b - Milestones - Assurance,G23
Assurance MM17 Variance,6b - Milestones - Assurance,H23
Assurance MM17 Status,6b - Milestones - Assurance,I23
Assurance MM17 Notes,6b - Milestones - Assurance,J23
Assurance MM18,6b - Milestones - Assurance,D24
Assurance MM18 LoD,6b - Milestones - Assurance,E24
Assurance MM18 Original Bobline,6b - Milestones - Assurance,F24
Assurance MM18 Forecast - Actual,6b - Milestones - Assurance,G24
Assurance MM18 Variance,6b - Milestones - Assurance,H24
Assurance MM18 Status,6b - Milestones - Assurance,I24
Assurance MM18 Notes,6b - Milestones - Assurance,J24
Assurance MM19,6b - Milestones - Assurance,D25
Assurance MM19 LoD,6b - Milestones - Assurance,E25
Assurance MM19 Original Bobline,6b - Milestones - Assurance,F25
Assurance MM19 Forecast - Actual,6b - Milestones - Assurance,G25
Assurance MM19 Variance,6b - Milestones - Assurance,H25
Assurance MM19 Status,6b - Milestones - Assurance,I25
Assurance MM19 Notes,6b - Milestones - Assurance,J25
Assurance MM20,6b - Milestones - Assurance,D26
Assurance MM20 LoD,6b - Milestones - Assurance,E26
Assurance MM20 Original Bobline,6b - Milestones - Assurance,F26
Assurance MM20 Forecast - Actual,6b - Milestones - Assurance,G26
Assurance MM20 Variance,6b - Milestones - Assurance,H26
Assurance MM20 Status,6b - Milestones - Assurance,I26
Assurance MM20 Notes,6b - Milestones - Assurance,J26
Assurance MM21,6b - Milestones - Assurance,D27
Assurance MM21 LoD,6b - Milestones - Assurance,E27
Assurance MM21 Original Bobline,6b - Milestones - Assurance,F27
Assurance MM21 Forecast - Actual,6b - Milestones - Assurance,G27
Assurance MM21 Variance,6b - Milestones - Assurance,H27
Assurance MM21 Status,6b - Milestones - Assurance,I27
Assurance MM21 Notes,6b - Milestones - Assurance,J27
Assurance MM22,6b - Milestones - Assurance,D28
Assurance MM22 LoD,6b - Milestones - Assurance,E28
Assurance MM22 Original Bobline,6b - Milestones - Assurance,F28
Assurance MM22 Forecast - Actual,6b - Milestones - Assurance,G28
Assurance MM22 Variance,6b - Milestones - Assurance,H28
Assurance MM22 Status,6b - Milestones - Assurance,I28
Assurance MM22 Notes,6b - Milestones - Assurance,J28
Assurance MM23,6b - Milestones - Assurance,D29
Assurance MM23 LoD,6b - Milestones - Assurance,E29
Assurance MM23 Original Bobline,6b - Milestones - Assurance,F29
Assurance MM23 Forecast - Actual,6b - Milestones - Assurance,G29
Assurance MM23 Variance,6b - Milestones - Assurance,H29
Assurance MM23 Status,6b - Milestones - Assurance,I29
Assurance MM23 Notes,6b - Milestones - Assurance,J29
Assurance MM24,6b - Milestones - Assurance,D30
Assurance MM24 LoD,6b - Milestones - Assurance,E30
Assurance MM24 Original Bobline,6b - Milestones - Assurance,F30
Assurance MM24 Forecast - Actual,6b - Milestones - Assurance,G30
Assurance MM24 Variance,6b - Milestones - Assurance,H30
Assurance MM24 Status,6b - Milestones - Assurance,I30
Assurance MM24 Notes,6b - Milestones - Assurance,J30
Assurance MM25,6b - Milestones - Assurance,D31
Assurance MM25 LoD,6b - Milestones - Assurance,E31
Assurance MM25 Original Bobline,6b - Milestones - Assurance,F31
Assurance MM25 Forecast - Actual,6b - Milestones - Assurance,G31
Assurance MM25 Variance,6b - Milestones - Assurance,H31
Assurance MM25 Status,6b - Milestones - Assurance,I31
Assurance MM25 Notes,6b - Milestones - Assurance,J31
Assurance MM26,6b - Milestones - Assurance,D32
Assurance MM26 LoD,6b - Milestones - Assurance,E32
Assurance MM26 Original Bobline,6b - Milestones - Assurance,F32
Assurance MM26 Forecast - Actual,6b - Milestones - Assurance,G32
Assurance MM26 Variance,6b - Milestones - Assurance,H32
Assurance MM26 Status,6b - Milestones - Assurance,I32
Assurance MM26 Notes,6b - Milestones - Assurance,J32
Assurance MM27,6b - Milestones - Assurance,D33
Assurance MM27 LoD,6b - Milestones - Assurance,E33
Assurance MM27 Original Bobline,6b - Milestones - Assurance,F33
Assurance MM27 Forecast - Actual,6b - Milestones - Assurance,G33
Assurance MM27 Variance,6b - Milestones - Assurance,H33
Assurance MM27 Status,6b - Milestones - Assurance,I33
Assurance MM27 Notes,6b - Milestones - Assurance,J33
Assurance MM28,6b - Milestones - Assurance,D34
Assurance MM28 LoD,6b - Milestones - Assurance,E34
Assurance MM28 Original Bobline,6b - Milestones - Assurance,F34
Assurance MM28 Forecast - Actual,6b - Milestones - Assurance,G34
Assurance MM28 Variance,6b - Milestones - Assurance,H34
Assurance MM28 Status,6b - Milestones - Assurance,I34
Assurance MM28 Notes,6b - Milestones - Assurance,J34
Assurance MM29,6b - Milestones - Assurance,D35
Assurance MM29 LoD,6b - Milestones - Assurance,E35
Assurance MM29 Original Bobline,6b - Milestones - Assurance,F35
Assurance MM29 Forecast - Actual,6b - Milestones - Assurance,G35
Assurance MM29 Variance,6b - Milestones - Assurance,H35
Assurance MM29 Status,6b - Milestones - Assurance,I35
Assurance MM29 Notes,6b - Milestones - Assurance,J35
Assurance MM30,6b - Milestones - Assurance,D36
Assurance MM30 LoD,6b - Milestones - Assurance,E36
Assurance MM30 Original Bobline,6b - Milestones - Assurance,F36
Assurance MM30 Forecast - Actual,6b - Milestones - Assurance,G36
Assurance MM30 Variance,6b - Milestones - Assurance,H36
Assurance MM30 Status,6b - Milestones - Assurance,I36
Assurance MM30 Notes,6b - Milestones - Assurance,J36
Assurance MM31,6b - Milestones - Assurance,D37
Assurance MM31 LoD,6b - Milestones - Assurance,E37
Assurance MM31 Original Bobline,6b - Milestones - Assurance,F37
Assurance MM31 Forecast - Actual,6b - Milestones - Assurance,G37
Assurance MM31 Variance,6b - Milestones - Assurance,H37
Assurance MM31 Status,6b - Milestones - Assurance,I37
Assurance MM31 Notes,6b - Milestones - Assurance,J37
Assurance MM32,6b - Milestones - Assurance,D38
Assurance MM32 LoD,6b - Milestones - Assurance,E38
Assurance MM32 Original Bobline,6b - Milestones - Assurance,F38
Assurance MM32 Forecast - Actual,6b - Milestones - Assurance,G38
Assurance MM32 Variance,6b - Milestones - Assurance,H38
Assurance MM32 Status,6b - Milestones - Assurance,I38
Assurance MM32 Notes,6b - Milestones - Assurance,J38
Assurance MM33,6b - Milestones - Assurance,D39
Assurance MM33 LoD,6b - Milestones - Assurance,E39
Assurance MM33 Original Bobline,6b - Milestones - Assurance,F39
Assurance MM33 Forecast - Actual,6b - Milestones - Assurance,G39
Assurance MM33 Variance,6b - Milestones - Assurance,H39
Assurance MM33 Status,6b - Milestones - Assurance,I39
Assurance MM33 Notes,6b - Milestones - Assurance,J39
Assurance MM34,6b - Milestones - Assurance,D40
Assurance MM34 LoD,6b - Milestones - Assurance,E40
Assurance MM34 Original Bobline,6b - Milestones - Assurance,F40
Assurance MM34 Forecast - Actual,6b - Milestones - Assurance,G40
Assurance MM34 Variance,6b - Milestones - Assurance,H40
Assurance MM34 Status,6b - Milestones - Assurance,I40
Assurance MM34 Notes,6b - Milestones - Assurance,J40
Assurance MM35,6b - Milestones - Assurance,D41
Assurance MM35 LoD,6b - Milestones - Assurance,E41
Assurance MM35 Original Bobline,6b - Milestones - Assurance,F41
Assurance MM35 Forecast - Actual,6b - Milestones - Assurance,G41
Assurance MM35 Variance,6b - Milestones - Assurance,H41
Assurance MM35 Status,6b - Milestones - Assurance,I41
Assurance MM35 Notes,6b - Milestones - Assurance,J41
Assurance MM36,6b - Milestones - Assurance,D42
Assurance MM36 LoD,6b - Milestones - Assurance,E42
Assurance MM36 Original Bobline,6b - Milestones - Assurance,F42
Assurance MM36 Forecast - Actual,6b - Milestones - Assurance,G42
Assurance MM36 Variance,6b - Milestones - Assurance,H42
Assurance MM36 Status,6b - Milestones - Assurance,I42
Assurance MM36 Notes,6b - Milestones - Assurance,J42
Assurance MM37,6b - Milestones - Assurance,D43
Assurance MM37 LoD,6b - Milestones - Assurance,E43
Assurance MM37 Original Bobline,6b - Milestones - Assurance,F43
Assurance MM37 Forecast - Actual,6b - Milestones - Assurance,G43
Assurance MM37 Variance,6b - Milestones - Assurance,H43
Assurance MM37 Status,6b - Milestones - Assurance,I43
Assurance MM37 Notes,6b - Milestones - Assurance,J43
Assurance MM38,6b - Milestones - Assurance,D44
Assurance MM38 LoD,6b - Milestones - Assurance,E44
Assurance MM38 Original Bobline,6b - Milestones - Assurance,F44
Assurance MM38 Forecast - Actual,6b - Milestones - Assurance,G44
Assurance MM38 Variance,6b - Milestones - Assurance,H44
Assurance MM38 Status,6b - Milestones - Assurance,I44
Assurance MM38 Notes,6b - Milestones - Assurance,J44
Assurance MM39,6b - Milestones - Assurance,D45
Assurance MM39 LoD,6b - Milestones - Assurance,E45
Assurance MM39 Original Bobline,6b - Milestones - Assurance,F45
Assurance MM39 Forecast - Actual,6b - Milestones - Assurance,G45
Assurance MM39 Variance,6b - Milestones - Assurance,H45
Assurance MM39 Status,6b - Milestones - Assurance,I45
Assurance MM39 Notes,6b - Milestones - Assurance,J45
Assurance MM40,6b - Milestones - Assurance,D46
Assurance MM40 LoD,6b - Milestones - Assurance,E46
Assurance MM40 Original Bobline,6b - Milestones - Assurance,F46
Assurance MM40 Forecast - Actual,6b - Milestones - Assurance,G46
Assurance MM40 Variance,6b - Milestones - Assurance,H46
Assurance MM40 Status,6b - Milestones - Assurance,I46
Assurance MM40 Notes,6b - Milestones - Assurance,J46
Assurance MM41,6b - Milestones - Assurance,D47
Assurance MM41 LoD,6b - Milestones - Assurance,E47
Assurance MM41 Original Bobline,6b - Milestones - Assurance,F47
Assurance MM41 Forecast - Actual,6b - Milestones - Assurance,G47
Assurance MM41 Variance,6b - Milestones - Assurance,H47
Assurance MM41 Status,6b - Milestones - Assurance,I47
Assurance MM41 Notes,6b - Milestones - Assurance,J47
Assurance MM42,6b - Milestones - Assurance,D48
Assurance MM42 LoD,6b - Milestones - Assurance,E48
Assurance MM42 Original Bobline,6b - Milestones - Assurance,F48
Assurance MM42 Forecast - Actual,6b - Milestones - Assurance,G48
Assurance MM42 Variance,6b - Milestones - Assurance,H48
Assurance MM42 Status,6b - Milestones - Assurance,I48
Assurance MM42 Notes,6b - Milestones - Assurance,J48
Assurance MM43,6b - Milestones - Assurance,D49
Assurance MM43 LoD,6b - Milestones - Assurance,E49
Assurance MM43 Original Bobline,6b - Milestones - Assurance,F49
Assurance MM43 Forecast - Actual,6b - Milestones - Assurance,G49
Assurance MM43 Variance,6b - Milestones - Assurance,H49
Assurance MM43 Status,6b - Milestones - Assurance,I49
Assurance MM43 Notes,6b - Milestones - Assurance,J49
Assurance MM44,6b - Milestones - Assurance,D50
Assurance MM44 LoD,6b - Milestones - Assurance,E50
Assurance MM44 Original Bobline,6b - Milestones - Assurance,F50
Assurance MM44 Forecast - Actual,6b - Milestones - Assurance,G50
Assurance MM44 Variance,6b - Milestones - Assurance,H50
Assurance MM44 Status,6b - Milestones - Assurance,I50
Assurance MM44 Notes,6b - Milestones - Assurance,J50
Assurance MM45,6b - Milestones - Assurance,D51
Assurance MM45 LoD,6b - Milestones - Assurance,E51
Assurance MM45 Original Bobline,6b - Milestones - Assurance,F51
Assurance MM45 Forecast - Actual,6b - Milestones - Assurance,G51
Assurance MM45 Variance,6b - Milestones - Assurance,H51
Assurance MM45 Status,6b - Milestones - Assurance,I51
Assurance MM45 Notes,6b - Milestones - Assurance,J51
Assurance MM46,6b - Milestones - Assurance,D52
Assurance MM46 LoD,6b - Milestones - Assurance,E52
Assurance MM46 Original Bobline,6b - Milestones - Assurance,F52
Assurance MM46 Forecast - Actual,6b - Milestones - Assurance,G52
Assurance MM46 Variance,6b - Milestones - Assurance,H52
Assurance MM46 Status,6b - Milestones - Assurance,I52
Assurance MM46 Notes,6b - Milestones - Assurance,J52
Assurance MM47,6b - Milestones - Assurance,D53
Assurance MM47 LoD,6b - Milestones - Assurance,E53
Assurance MM47 Original Bobline,6b - Milestones - Assurance,F53
Assurance MM47 Forecast - Actual,6b - Milestones - Assurance,G53
Assurance MM47 Variance,6b - Milestones - Assurance,H53
Assurance MM47 Status,6b - Milestones - Assurance,I53
Assurance MM47 Notes,6b - Milestones - Assurance,J53
Assurance MM48,6b - Milestones - Assurance,D54
Assurance MM48 LoD,6b - Milestones - Assurance,E54
Assurance MM48 Original Bobline,6b - Milestones - Assurance,F54
Assurance MM48 Forecast - Actual,6b - Milestones - Assurance,G54
Assurance MM48 Variance,6b - Milestones - Assurance,H54
Assurance MM48 Status,6b - Milestones - Assurance,I54
Assurance MM48 Notes,6b - Milestones - Assurance,J54
Assurance MM49,6b - Milestones - Assurance,D55
Assurance MM49 LoD,6b - Milestones - Assurance,E55
Assurance MM49 Original Bobline,6b - Milestones - Assurance,F55
Assurance MM49 Forecast - Actual,6b - Milestones - Assurance,G55
Assurance MM49 Variance,6b - Milestones - Assurance,H55
Assurance MM49 Status,6b - Milestones - Assurance,I55
Assurance MM49 Notes,6b - Milestones - Assurance,J55
Assurance MM50,6b - Milestones - Assurance,D56
Assurance MM50 LoD,6b - Milestones - Assurance,E56
Assurance MM50 Original Bobline,6b - Milestones - Assurance,F56
Assurance MM50 Forecast - Actual,6b - Milestones - Assurance,G56
Assurance MM50 Variance,6b - Milestones - Assurance,H56
Assurance MM50 Status,6b - Milestones - Assurance,I56
Assurance MM50 Notes,6b - Milestones - Assurance,J56
Project MM18,6c - Milestones - Delivery,D7
Project MM18 CP,6c - Milestones - Delivery,E7
Project MM18 Original Bobline,6c - Milestones - Delivery,F7
Project MM18 Forecast - Actual,6c - Milestones - Delivery,G7
Project MM18 Variance,6c - Milestones - Delivery,H7
Project MM18 Status,6c - Milestones - Delivery,I7
Project MM18 Notes,6c - Milestones - Delivery,J7
Project MM19,6c - Milestones - Delivery,D8
Project MM19 CP,6c - Milestones - Delivery,E8
Project MM19 Original Bobline,6c - Milestones - Delivery,F8
Project MM19 Forecast - Actual,6c - Milestones - Delivery,G8
Project MM19 Variance,6c - Milestones - Delivery,H8
Project MM19 Status,6c - Milestones - Delivery,I8
Project MM19 Notes,6c - Milestones - Delivery,J8
Project MM20,6c - Milestones - Delivery,D9
Project MM20 CP,6c - Milestones - Delivery,E9
Project MM20 Original Bobline,6c - Milestones - Delivery,F9
Project MM20 Forecast - Actual,6c - Milestones - Delivery,G9
Project MM20 Variance,6c - Milestones - Delivery,H9
Project MM20 Status,6c - Milestones - Delivery,I9
Project MM20 Notes,6c - Milestones - Delivery,J9
Project MM21,6c - Milestones - Delivery,D10
Project MM21 CP,6c - Milestones - Delivery,E10
Project MM21 Original Bobline,6c - Milestones - Delivery,F10
Project MM21 Forecast - Actual,6c - Milestones - Delivery,G10
Project MM21 Variance,6c - Milestones - Delivery,H10
Project MM21 Status,6c - Milestones - Delivery,I10
Project MM21 Notes,6c - Milestones - Delivery,J10
Project MM22,6c - Milestones - Delivery,D11
Project MM22 CP,6c - Milestones - Delivery,E11
Project MM22 Original Bobline,6c - Milestones - Delivery,F11
Project MM22 Forecast - Actual,6c - Milestones - Delivery,G11
Project MM22 Variance,6c - Milestones - Delivery,H11
Project MM22 Status,6c - Milestones - Delivery,I11
Project MM22 Notes,6c - Milestones - Delivery,J11
Project MM23,6c - Milestones - Delivery,D12
Project MM23 CP,6c - Milestones - Delivery,E12
Project MM23 Original Bobline,6c - Milestones - Delivery,F12
Project MM23 Forecast - Actual,6c - Milestones - Delivery,G12
Project MM23 Variance,6c - Milestones - Delivery,H12
Project MM23 Status,6c - Milestones - Delivery,I12
Project MM23 Notes,6c - Milestones - Delivery,J12
Project MM24,6c - Milestones - Delivery,D13
Project MM24 CP,6c - Milestones - Delivery,E13
Project MM24 Original Bobline,6c - Milestones - Delivery,F13
Project MM24 Forecast - Actual,6c - Milestones - Delivery,G13
Project MM24 Variance,6c - Milestones - Delivery,H13
Project MM24 Status,6c - Milestones - Delivery,I13
Project MM24 Notes,6c - Milestones - Delivery,J13
Project MM25,6c - Milestones - Delivery,D14
Project MM25 CP,6c - Milestones - Delivery,E14
Project MM25 Original Bobline,6c - Milestones - Delivery,F14
Project MM25 Forecast - Actual,6c - Milestones - Delivery,G14
Project MM25 Variance,6c - Milestones - Delivery,H14
Project MM25 Status,6c - Milestones - Delivery,I14
Project MM25 Notes,6c - Milestones - Delivery,J14
Project MM26,6c - Milestones - Delivery,D15
Project MM26 CP,6c - Milestones - Delivery,E15
Project MM26 Original Bobline,6c - Milestones - Delivery,F15
Project MM26 Forecast - Actual,6c - Milestones - Delivery,G15
Project MM26 Variance,6c - Milestones - Delivery,H15
Project MM26 Status,6c - Milestones - Delivery,I15
Project MM26 Notes,6c - Milestones - Delivery,J15
Project MM27,6c - Milestones - Delivery,D16
Project MM27 CP,6c - Milestones - Delivery,E16
Project MM27 Original Bobline,6c - Milestones - Delivery,F16
Project MM27 Forecast - Actual,6c - Milestones - Delivery,G16
Project MM27 Variance,6c - Milestones - Delivery,H16
Project MM27 Status,6c - Milestones - Delivery,I16
Project MM27 Notes,6c - Milestones - Delivery,J16
Project MM28,6c - Milestones - Delivery,D17
Project MM28 CP,6c - Milestones - Delivery,E17
Project MM28 Original Bobline,6c - Milestones - Delivery,F17
Project MM28 Forecast - Actual,6c - Milestones - Delivery,G17
Project MM28 Variance,6c - Milestones - Delivery,H17
Project MM28 Status,6c - Milestones - Delivery,I17
Project MM28 Notes,6c - Milestones - Delivery,J17
Project MM29,6c - Milestones - Delivery,D18
Project MM29 CP,6c - Milestones - Delivery,E18
Project MM29 Original Bobline,6c - Milestones - Delivery,F18
Project MM29 Forecast - Actual,6c - Milestones - Delivery,G18
Project MM29 Variance,6c - Milestones - Delivery,H18
Project MM29 Status,6c - Milestones - Delivery,I18
Project MM29 Notes,6c - Milestones - Delivery,J18
Project MM30,6c - Milestones - Delivery,D19
Project MM30 CP,6c - Milestones - Delivery,E19
Project MM30 Original Bobline,6c - Milestones - Delivery,F19
Project MM30 Forecast - Actual,6c - Milestones - Delivery,G19
Project MM30 Variance,6c - Milestones - Delivery,H19
Project MM30 Status,6c - Milestones - Delivery,I19
Project MM30 Notes,6c - Milestones - Delivery,J19
Project MM31,6c - Milestones - Delivery,D20
Project MM31 CP,6c - Milestones - Delivery,E20
Project MM31 Original Bobline,6c - Milestones - Delivery,F20
Project MM31 Forecast - Actual,6c - Milestones - Delivery,G20
Project MM31 Variance,6c - Milestones - Delivery,H20
Project MM31 Status,6c - Milestones - Delivery,I20
Project MM31 Notes,6c - Milestones - Delivery,J20
Project MM32,6c - Milestones - Delivery,D21
Project MM32 CP,6c - Milestones - Delivery,E21
Project MM32 Original Bobline,6c - Milestones - Delivery,F21
Project MM32 Forecast - Actual,6c - Milestones - Delivery,G21
Project MM32 Variance,6c - Milestones - Delivery,H21
Project MM32 Status,6c - Milestones - Delivery,I21
Project MM32 Notes,6c - Milestones - Delivery,J21
Project MM33,6c - Milestones - Delivery,D22
Project MM33 CP,6c - Milestones - Delivery,E22
Project MM33 Original Bobline,6c - Milestones - Delivery,F22
Project MM33 Forecast - Actual,6c - Milestones - Delivery,G22
Project MM33 Variance,6c - Milestones - Delivery,H22
Project MM33 Status,6c - Milestones - Delivery,I22
Project MM33 Notes,6c - Milestones - Delivery,J22
Project MM34,6c - Milestones - Delivery,D23
Project MM34 CP,6c - Milestones - Delivery,E23
Project MM34 Original Bobline,6c - Milestones - Delivery,F23
Project MM34 Forecast - Actual,6c - Milestones - Delivery,G23
Project MM34 Variance,6c - Milestones - Delivery,H23
Project MM34 Status,6c - Milestones - Delivery,I23
Project MM34 Notes,6c - Milestones - Delivery,J23
Project MM35,6c - Milestones - Delivery,D24
Project MM35 CP,6c - Milestones - Delivery,E24
Project MM35 Original Bobline,6c - Milestones - Delivery,F24
Project MM35 Forecast - Actual,6c - Milestones - Delivery,G24
Project MM35 Variance,6c - Milestones - Delivery,H24
Project MM35 Status,6c - Milestones - Delivery,I24
Project MM35 Notes,6c - Milestones - Delivery,J24
Project MM36,6c - Milestones - Delivery,D25
Project MM36 CP,6c - Milestones - Delivery,E25
Project MM36 Original Bobline,6c - Milestones - Delivery,F25
Project MM36 Forecast - Actual,6c - Milestones - Delivery,G25
Project MM36 Variance,6c - Milestones - Delivery,H25
Project MM36 Status,6c - Milestones - Delivery,I25
Project MM36 Notes,6c - Milestones - Delivery,J25
Project MM37,6c - Milestones - Delivery,D26
Project MM37 CP,6c - Milestones - Delivery,E26
Project MM37 Original Bobline,6c - Milestones - Delivery,F26
Project MM37 Forecast - Actual,6c - Milestones - Delivery,G26
Project MM37 Variance,6c - Milestones - Delivery,H26
Project MM37 Status,6c - Milestones - Delivery,I26
Project MM37 Notes,6c - Milestones - Delivery,J26
Project MM38,6c - Milestones - Delivery,D27
Project MM38 CP,6c - Milestones - Delivery,E27
Project MM38 Original Bobline,6c - Milestones - Delivery,F27
Project MM38 Forecast - Actual,6c - Milestones - Delivery,G27
Project MM38 Variance,6c - Milestones - Delivery,H27
Project MM38 Status,6c - Milestones - Delivery,I27
Project MM38 Notes,6c - Milestones - Delivery,J27
Project MM39,6c - Milestones - Delivery,D28
Project MM39 CP,6c - Milestones - Delivery,E28
Project MM39 Original Bobline,6c - Milestones - Delivery,F28
Project MM39 Forecast - Actual,6c - Milestones - Delivery,G28
Project MM39 Variance,6c - Milestones - Delivery,H28
Project MM39 Status,6c - Milestones - Delivery,I28
Project MM39 Notes,6c - Milestones - Delivery,J28
Project MM40,6c - Milestones - Delivery,D29
Project MM40 CP,6c - Milestones - Delivery,E29
Project MM40 Original Bobline,6c - Milestones - Delivery,F29
Project MM40 Forecast - Actual,6c - Milestones - Delivery,G29
Project MM40 Variance,6c - Milestones - Delivery,H29
Project MM40 Status,6c - Milestones - Delivery,I29
Project MM40 Notes,6c - Milestones - Delivery,J29
Project MM41,6c - Milestones - Delivery,D30
Project MM41 CP,6c - Milestones - Delivery,E30
Project MM41 Original Bobline,6c - Milestones - Delivery,F30
Project MM41 Forecast - Actual,6c - Milestones - Delivery,G30
Project MM41 Variance,6c - Milestones - Delivery,H30
Project MM41 Status,6c - Milestones - Delivery,I30
Project MM41 Notes,6c - Milestones - Delivery,J30
Project MM42,6c - Milestones - Delivery,D31
Project MM42 CP,6c - Milestones - Delivery,E31
Project MM42 Original Bobline,6c - Milestones - Delivery,F31
Project MM42 Forecast - Actual,6c - Milestones - Delivery,G31
Project MM42 Variance,6c - Milestones - Delivery,H31
Project MM42 Status,6c - Milestones - Delivery,I31
Project MM42 Notes,6c - Milestones - Delivery,J31
Project MM43,6c - Milestones - Delivery,D32
Project MM43 CP,6c - Milestones - Delivery,E32
Project MM43 Original Bobline,6c - Milestones - Delivery,F32
Project MM43 Forecast - Actual,6c - Milestones - Delivery,G32
Project MM43 Variance,6c - Milestones - Delivery,H32
Project MM43 Status,6c - Milestones - Delivery,I32
Project MM43 Notes,6c - Milestones - Delivery,J32
Project MM44,6c - Milestones - Delivery,D33
Project MM44 CP,6c - Milestones - Delivery,E33
Project MM44 Original Bobline,6c - Milestones - Delivery,F33
Project MM44 Forecast - Actual,6c - Milestones - Delivery,G33
Project MM44 Variance,6c - Milestones - Delivery,H33
Project MM44 Status,6c - Milestones - Delivery,I33
Project MM44 Notes,6c - Milestones - Delivery,J33
Project MM45,6c - Milestones - Delivery,D34
Project MM45 CP,6c - Milestones - Delivery,E34
Project MM45 Original Bobline,6c - Milestones - Delivery,F34
Project MM45 Forecast - Actual,6c - Milestones - Delivery,G34
Project MM45 Variance,6c - Milestones - Delivery,H34
Project MM45 Status,6c - Milestones - Delivery,I34
Project MM45 Notes,6c - Milestones - Delivery,J34
Project MM46,6c - Milestones - Delivery,D35
Project MM46 CP,6c - Milestones - Delivery,E35
Project MM46 Original Bobline,6c - Milestones - Delivery,F35
Project MM46 Forecast - Actual,6c - Milestones - Delivery,G35
Project MM46 Variance,6c - Milestones - Delivery,H35
Project MM46 Status,6c - Milestones - Delivery,I35
Project MM46 Notes,6c - Milestones - Delivery,J35
Project MM47,6c - Milestones - Delivery,D36
Project MM47 CP,6c - Milestones - Delivery,E36
Project MM47 Original Bobline,6c - Milestones - Delivery,F36
Project MM47 Forecast - Actual,6c - Milestones - Delivery,G36
Project MM47 Variance,6c - Milestones - Delivery,H36
Project MM47 Status,6c - Milestones - Delivery,I36
Project MM47 Notes,6c - Milestones - Delivery,J36
Project MM48 ,6c - Milestones - Delivery,D37
Project MM48 CP,6c - Milestones - Delivery,E37
Project MM48 Original Bobline,6c - Milestones - Delivery,F37
Project MM48 Forecast - Actual,6c - Milestones - Delivery,G37
Project MM48 Variance,6c - Milestones - Delivery,H37
Project MM48 Status,6c - Milestones - Delivery,I37
Project MM48 Notes,6c - Milestones - Delivery,J37
Project MM49,6c - Milestones - Delivery,D38
Project MM49 CP,6c - Milestones - Delivery,E38
Project MM49 Original Bobline,6c - Milestones - Delivery,F38
Project MM49 Forecast - Actual,6c - Milestones - Delivery,G38
Project MM49 Variance,6c - Milestones - Delivery,H38
Project MM49 Status,6c - Milestones - Delivery,I38
Project MM49 Notes,6c - Milestones - Delivery,J38
Project MM50,6c - Milestones - Delivery,D39
Project MM50 CP,6c - Milestones - Delivery,E39
Project MM50 Original Bobline,6c - Milestones - Delivery,F39
Project MM50 Forecast - Actual,6c - Milestones - Delivery,G39
Project MM50 Variance,6c - Milestones - Delivery,H39
Project MM50 Status,6c - Milestones - Delivery,I39
Project MM50 Notes,6c - Milestones - Delivery,J39
Project MM51,6c - Milestones - Delivery,D40
Project MM51 CP,6c - Milestones - Delivery,E40
Project MM51 Original Bobline,6c - Milestones - Delivery,F40
Project MM51 Forecast - Actual,6c - Milestones - Delivery,G40
Project MM51 Variance,6c - Milestones - Delivery,H40
Project MM51 Status,6c - Milestones - Delivery,I40
Project MM51 Notes,6c - Milestones - Delivery,J40
Project MM52,6c - Milestones - Delivery,D41
Project MM52 CP,6c - Milestones - Delivery,E41
Project MM52 Original Bobline,6c - Milestones - Delivery,F41
Project MM52 Forecast - Actual,6c - Milestones - Delivery,G41
Project MM52 Variance,6c - Milestones - Delivery,H41
Project MM52 Status,6c - Milestones - Delivery,I41
Project MM52 Notes,6c - Milestones - Delivery,J41
Project MM53,6c - Milestones - Delivery,D42
Project MM53 CP,6c - Milestones - Delivery,E42
Project MM53 Original Bobline,6c - Milestones - Delivery,F42
Project MM53 Forecast - Actual,6c - Milestones - Delivery,G42
Project MM53 Variance,6c - Milestones - Delivery,H42
Project MM53 Status,6c - Milestones - Delivery,I42
Project MM53 Notes,6c - Milestones - Delivery,J42
Project MM54,6c - Milestones - Delivery,D43
Project MM54 CP,6c - Milestones - Delivery,E43
Project MM54 Original Bobline,6c - Milestones - Delivery,F43
Project MM54 Forecast - Actual,6c - Milestones - Delivery,G43
Project MM54 Variance,6c - Milestones - Delivery,H43
Project MM54 Status,6c - Milestones - Delivery,I43
Project MM54 Notes,6c - Milestones - Delivery,J43
Project MM55,6c - Milestones - Delivery,D44
Project MM55 CP,6c - Milestones - Delivery,E44
Project MM55 Original Bobline,6c - Milestones - Delivery,F44
Project MM55 Forecast - Actual,6c - Milestones - Delivery,G44
Project MM55 Variance,6c - Milestones - Delivery,H44
Project MM55 Status,6c - Milestones - Delivery,I44
Project MM55 Notes,6c - Milestones - Delivery,J44
Project MM56,6c - Milestones - Delivery,D45
Project MM56 CP,6c - Milestones - Delivery,E45
Project MM56 Original Bobline,6c - Milestones - Delivery,F45
Project MM56 Forecast - Actual,6c - Milestones - Delivery,G45
Project MM56 Variance,6c - Milestones - Delivery,H45
Project MM56 Status,6c - Milestones - Delivery,I45
Project MM56 Notes,6c - Milestones - Delivery,J45
Project MM57,6c - Milestones - Delivery,D46
Project MM57 CP,6c - Milestones - Delivery,E46
Project MM57 Original Bobline,6c - Milestones - Delivery,F46
Project MM57 Forecast - Actual,6c - Milestones - Delivery,G46
Project MM57 Variance,6c - Milestones - Delivery,H46
Project MM57 Status,6c - Milestones - Delivery,I46
Project MM57 Notes,6c - Milestones - Delivery,J46
Project MM58,6c - Milestones - Delivery,D47
Project MM58 CP,6c - Milestones - Delivery,E47
Project MM58 Original Bobline,6c - Milestones - Delivery,F47
Project MM58 Forecast - Actual,6c - Milestones - Delivery,G47
Project MM58 Variance,6c - Milestones - Delivery,H47
Project MM58 Status,6c - Milestones - Delivery,I47
Project MM58 Notes,6c - Milestones - Delivery,J47
Project MM59,6c - Milestones - Delivery,D48
Project MM59 CP,6c - Milestones - Delivery,E48
Project MM59 Original Bobline,6c - Milestones - Delivery,F48
Project MM59 Forecast - Actual,6c - Milestones - Delivery,G48
Project MM59 Variance,6c - Milestones - Delivery,H48
Project MM59 Status,6c - Milestones - Delivery,I48
Project MM59 Notes,6c - Milestones - Delivery,J48
Project MM60,6c - Milestones - Delivery,D49
Project MM60 CP,6c - Milestones - Delivery,E49
Project MM60 Original Bobline,6c - Milestones - Delivery,F49
Project MM60 Forecast - Actual,6c - Milestones - Delivery,G49
Project MM60 Variance,6c - Milestones - Delivery,H49
Project MM60 Status,6c - Milestones - Delivery,I49
Project MM60 Notes,6c - Milestones - Delivery,J49
Project MM61,6c - Milestones - Delivery,D50
Project MM61 CP,6c - Milestones - Delivery,E50
Project MM61 Original Bobline,6c - Milestones - Delivery,F50
Project MM61 Forecast - Actual,6c - Milestones - Delivery,G50
Project MM61 Variance,6c - Milestones - Delivery,H50
Project MM61 Status,6c - Milestones - Delivery,I50
Project MM61 Notes,6c - Milestones - Delivery,J50
Project MM62,6c - Milestones - Delivery,D51
Project MM62 CP,6c - Milestones - Delivery,E51
Project MM62 Original Bobline,6c - Milestones - Delivery,F51
Project MM62 Forecast - Actual,6c - Milestones - Delivery,G51
Project MM62 Variance,6c - Milestones - Delivery,H51
Project MM62 Status,6c - Milestones - Delivery,I51
Project MM62 Notes,6c - Milestones - Delivery,J51
Project MM63,6c - Milestones - Delivery,D52
Project MM63 CP,6c - Milestones - Delivery,E52
Project MM63 Original Bobline,6c - Milestones - Delivery,F52
Project MM63 Forecast - Actual,6c - Milestones - Delivery,G52
Project MM63 Variance,6c - Milestones - Delivery,H52
Project MM63 Status,6c - Milestones - Delivery,I52
Project MM63 Notes,6c - Milestones - Delivery,J52
Project MM64,6c - Milestones - Delivery,D53
Project MM64 CP,6c - Milestones - Delivery,E53
Project MM64 Original Bobline,6c - Milestones - Delivery,F53
Project MM64 Forecast - Actual,6c - Milestones - Delivery,G53
Project MM64 Variance,6c - Milestones - Delivery,H53
Project MM64 Status,6c - Milestones - Delivery,I53
Project MM64 Notes,6c - Milestones - Delivery,J53
Project MM65,6c - Milestones - Delivery,D54
Project MM65 CP,6c - Milestones - Delivery,E54
Project MM65 Original Bobline,6c - Milestones - Delivery,F54
Project MM65 Forecast - Actual,6c - Milestones - Delivery,G54
Project MM65 Variance,6c - Milestones - Delivery,H54
Project MM65 Status,6c - Milestones - Delivery,I54
Project MM65 Notes,6c - Milestones - Delivery,J54
Project MM66,6c - Milestones - Delivery,D55
Project MM66 CP,6c - Milestones - Delivery,E55
Project MM66 Original Bobline,6c - Milestones - Delivery,F55
Project MM66 Forecast - Actual,6c - Milestones - Delivery,G55
Project MM66 Variance,6c - Milestones - Delivery,H55
Project MM66 Status,6c - Milestones - Delivery,I55
Project MM66 Notes,6c - Milestones - Delivery,J55
Project MM67,6c - Milestones - Delivery,D56
Project MM67 CP,6c - Milestones - Delivery,E56
Project MM67 Original Bobline,6c - Milestones - Delivery,F56
Project MM67 Forecast - Actual,6c - Milestones - Delivery,G56
Project MM67 Variance,6c - Milestones - Delivery,H56
Project MM67 Status,6c - Milestones - Delivery,I56
Project MM67 Notes,6c - Milestones - Delivery,J56
Milestone Commentary,6c - Milestones - Delivery,F110
SRO Schedule Confidence,6c - Milestones - Delivery,F109
Project stage,7 - Business Case,E6
Project Stage if Other,7 - Business Case,E7
Latest Treasury Approval Point (TAP) or equivalent,7 - Business Case,E10
Version Number Of Document used to Source Figures (DRRDD - TAP version Number),7 - Business Case,E11
Business Case & Version No.,7 - Business Case,E12
Date of TAP used to source figures,7 - Business Case,E13
"If no HMT Business Case, please advise why?",7 - Business Case,E14
"Is your HMT Business case updated / approved annually by HMT, or more frequently?",7 - Business Case,E15
Does the HMT Businesss Case cover the full life of the project?,7 - Business Case,E16
"If not, please provide explanation as to why",7 - Business Case,E17
"If not, please advise how many years are covered",7 - Business Case,E18
"If not, please advise how much cost is covered, as a percentage",7 - Business Case,E19
Are the baselines in this return from the most recent HMT Approved Business Case?,7 - Business Case,E20
"If not, what is the source of baselines in this returns?",7 - Business Case,E21
"If not, please give a reason why baselines",7 - Business Case,E22
What is the source of all forecasts in this return?,7 - Business Case,E23
"Please provide details of any formal arrangement with HMT regarding Business cases, that are outside the classical model",7 - Business Case,E24
BC One Off new costs,7 - Business Case,E29
BC Recurring new costs,7 - Business Case,F29
BC Recurring old costs,7 - Business Case,G29
BC Non Government costs,7 - Business Case,H29
BC Income,7 - Business Case,I29
BC Cashable benefits,7 - Business Case,E31
BC Non-Cashable benefits,7 - Business Case,F31
BC UK Economic benefits,7 - Business Case,G31
BC Disbenefits in the cost section,7 - Business Case,H31
BC Positive AME benefits in Cashable,7 - Business Case,I31
BC Non Monetised Benefits,7 - Business Case,J31
Real or Nominal - Bobline,8 - Finance,E6
Real or Nominal - Actual/Forecast,8 - Finance,E7
Index Year,8 - Finance,E8
Deflator,8 - Finance,E9
Are you reporting the full costs of the project?,8 - Finance,E10
"If no, please provide reason why?",8 - Finance,E11
Does this project create income?,8 - Finance,E14
Who recieves the income?,8 - Finance,E15
Do you net the income with your costs in the DRRDD return,8 - Finance,E16
Income Against which Cost category?,8 - Finance,E17
Income Bobline - Real or Nominal,8 - Finance,E18
Income Forecast - Real or Nominal,8 - Finance,E19
"Income If real, Index Year used?",8 - Finance,E20
"Income If real, Deflator used?",8 - Finance,E21
Are you reporting the full income of the project?,8 - Finance,E22
"Income If no, please provide reason why?",8 - Finance,E23
Does this project create monetised benefits?,8 - Finance,E26
Benefits Bobline - Real or Nominal,8 - Finance,E27
Benefits Forecast - Real or Nominal,8 - Finance,E28
"Benefits If real, Index Year used?",8 - Finance,E29
"Benefits If real, Deflator used?",8 - Finance,E30
Are you reporting the full benefits of the project?,8 - Finance,E31
"Benefits If no, please provide reason why?",8 - Finance,E32
Source of Finance,8 - Finance,E35
Other Finance type Description,8 - Finance,E36
Optimism Bias Percentage Used in Cost Boblines,8 - Finance,E37
Overall figure for Optimism Bias (£m),8 - Finance,E38
Built in contingency (% of Whole Life Cost),8 - Finance,E39
Overall contingency (£m),8 - Finance,E40
NPV for all projects and NPV for programmes if available,8 - Finance,E41
Internal Rate of Return (IRR),8 - Finance,E42
Adjusted Benefits Cost Ratio (BCR),8 - Finance,E43
Benefits Map,8 - Finance,E47
Benefits Analysed,8 - Finance,E48
Benefits Realisation Plan,8 - Finance,E49
Initial Benefits Cost Ratio (BCR),8 - Finance,E44
VfM Category,8 - Finance,E50
Present Value Cost (PVC),8 - Finance,E45
Present Value Benefit (PVB),8 - Finance,E46
Project Costs Narrative,9 - Costs,E6
Cost comparison with last quarters cost - narrative ,9 - Costs,E7
Cost comparison within this quarters cost - narrative ,9 - Costs,E8
Total Budget/BL,9 - Costs,F20
Total Forecast,9 - Costs,H20
Pre 19-20 TDEL BL one off new costs,9 - Costs,E27
Pre 19-20 TDEL BL recurring new costs,9 - Costs,F27
Pre 19-20 TDEL BL recurring old costs,9 - Costs,G27
Pre 19-20 TDEL BL Non Gov costs,9 - Costs,H27
Pre 19-20 TDEL BL Total,9 - Costs,I27
Pre 19-20 TDEL BL Income,9 - Costs,L27
Pre 19-20 TDEL Forecast one off new costs,9 - Costs,E28
Pre 19-20 TDEL Forecast recurring new costs,9 - Costs,F28
Pre 19-20 TDEL Forecast recurring old costs,9 - Costs,G28
Pre 19-20 TDEL Forecast Non Gov costs,9 - Costs,H28
Pre 19-20 TDEL Forecast Total,9 - Costs,I28
Pre 19-20 TDEL Forecast Income,9 - Costs,L28
19-20 TDEL BL one off new costs,9 - Costs,E29
19-20 TDEL BL recurring new costs,9 - Costs,F29
19-20 TDEL BL recurring old costs,9 - Costs,G29
19-20 TDEL BL Non Gov costs,9 - Costs,H29
19-20 TDEL BL Total,9 - Costs,I29
19-20 TDEL BL Income,9 - Costs,L29
19-20 TDEL Forecast one off new costs,9 - Costs,E30
19-20 TDEL Forecast recurring new costs,9 - Costs,F30
19-20 TDEL Forecast recurring old costs,9 - Costs,G30
19-20 TDEL Forecast Non Gov costs,9 - Costs,H30
19-20 TDEL Forecast Total,9 - Costs,I30
19-20 TDEL Forecast Income,9 - Costs,L30
20-21 TDEL BL one off new costs,9 - Costs,E31
20-21 TDEL BL recurring new costs,9 - Costs,F31
20-21 TDEL BL recurring old costs,9 - Costs,G31
20-21 TDEL BL Non Gov costs,9 - Costs,H31
20-21 TDEL BL Total,9 - Costs,I31
20-21 TDEL BL Income,9 - Costs,L31
20-21 TDEL Forecast one off new costs,9 - Costs,E32
20-21 TDEL Forecast recurring new costs,9 - Costs,F32
20-21 TDEL Forecast recurring old costs,9 - Costs,G32
20-21 TDEL Forecast Non Gov costs,9 - Costs,H32
20-21 TDEL Forecast Total,9 - Costs,I32
20-21 TDEL Forecast Income,9 - Costs,L32
21-22 TDEL BL one off new costs,9 - Costs,E33
21-22 TDEL BL recurring new costs,9 - Costs,F33
21-22 TDEL BL recurring old costs,9 - Costs,G33
21-22 TDEL BL Non Gov costs,9 - Costs,H33
21-22 TDEL BL Total,9 - Costs,I33
21-22 TDEL BL Income,9 - Costs,L33
21-22 TDEL Forecast one off new costs,9 - Costs,E34
21-22 TDEL Forecast recurring new costs,9 - Costs,F34
21-22 TDEL Forecast recurring old costs,9 - Costs,G34
21-22 TDEL Forecast Non Gov costs,9 - Costs,H34
21-22 TDEL Forecast Total,9 - Costs,I34
21-22 TDEL Forecast Income,9 - Costs,L34
22-23 TDEL BL one off new costs,9 - Costs,E35
22-23 TDEL BL recurring new costs,9 - Costs,F35
22-23 TDEL BL recurring old costs,9 - Costs,G35
22-23 TDEL BL Non Gov costs,9 - Costs,H35
22-23 TDEL BL Total,9 - Costs,I35
22-23 TDEL BL Income,9 - Costs,L35
22-23 TDEL Forecast one off new costs,9 - Costs,E36
22-23 TDEL Forecast recurring new costs,9 - Costs,F36
22-23 TDEL Forecast recurring old costs,9 - Costs,G36
22-23 TDEL Forecast Non Gov costs,9 - Costs,H36
22-23 TDEL Forecast Total,9 - Costs,I36
22-23 TDEL Forecast Income,9 - Costs,L36
23-24 TDEL BL one off new costs,9 - Costs,E37
23-24 TDEL BL recurring new costs,9 - Costs,F37
23-24 TDEL BL recurring old costs,9 - Costs,G37
23-24 TDEL BL Non Gov costs,9 - Costs,H37
23-24 TDEL BL Total,9 - Costs,I37
23-24 TDEL BL Income,9 - Costs,L37
23-24 TDEL Forecast one off new costs,9 - Costs,E38
23-24 TDEL Forecast recurring new costs,9 - Costs,F38
23-24 TDEL Forecast recurring old costs,9 - Costs,G38
23-24 TDEL Forecast Non Gov costs,9 - Costs,H38
23-24 TDEL Forecast Total,9 - Costs,I38
23-24 TDEL Forecast Income,9 - Costs,L38
24-25 TDEL BL one off new costs,9 - Costs,E39
24-25 TDEL BL recurring new costs,9 - Costs,F39
24-25 TDEL BL recurring old costs,9 - Costs,G39
24-25 TDEL BL Non Gov costs,9 - Costs,H39
24-25 TDEL BL Total,9 - Costs,I39
24-25 TDEL BL Income,9 - Costs,L39
24-25 TDEL Forecast one off new costs,9 - Costs,E40
24-25 TDEL Forecast recurring new costs,9 - Costs,F40
24-25 TDEL Forecast recurring old costs,9 - Costs,G40
24-25 TDEL Forecast Non Gov costs,9 - Costs,H40
24-25 TDEL Forecast Total,9 - Costs,I40
24-25 TDEL Forecast Income,9 - Costs,L40
25-26 TDEL BL one off new costs,9 - Costs,E41
25-26 TDEL BL recurring new costs,9 - Costs,F41
25-26 TDEL BL recurring old costs,9 - Costs,G41
25-26 TDEL BL Non Gov costs,9 - Costs,H41
25-26 TDEL BL Total,9 - Costs,I41
25-26 TDEL BL Income,9 - Costs,L41
25-26 TDEL Forecast one off new costs,9 - Costs,E42
25-26 TDEL Forecast recurring new costs,9 - Costs,F42
25-26 TDEL Forecast recurring old costs,9 - Costs,G42
25-26 TDEL Forecast Non Gov costs,9 - Costs,H42
25-26 TDEL Forecast Total,9 - Costs,I42
25-26 TDEL Forecast Income,9 - Costs,L42
26-27 TDEL BL one off new costs,9 - Costs,E43
26-27 TDEL BL recurring new costs,9 - Costs,F43
26-27 TDEL BL recurring old costs,9 - Costs,G43
26-27 TDEL BL Non Gov costs,9 - Costs,H43
26-27 TDEL BL Total,9 - Costs,I43
26-27 TDEL BL Income,9 - Costs,L43
26-27 TDEL Forecast one off new costs,9 - Costs,E44
26-27 TDEL Forecast recurring new costs,9 - Costs,F44
26-27 TDEL Forecast recurring old costs,9 - Costs,G44
26-27 TDEL Forecast Non Gov costs,9 - Costs,H44
26-27 TDEL Forecast Total,9 - Costs,I44
26-27 TDEL Forecast Income,9 - Costs,L44
27-28 TDEL BL one off new costs,9 - Costs,E45
27-28 TDEL BL recurring new costs,9 - Costs,F45
27-28 TDEL BL recurring old costs,9 - Costs,G45
27-28 TDEL BL Non Gov costs,9 - Costs,H45
27-28 TDEL BL Total,9 - Costs,I45
27-28 TDEL BL Income,9 - Costs,L45
27-28 TDEL Forecast one off new costs,9 - Costs,E46
27-28 TDEL Forecast recurring new costs,9 - Costs,F46
27-28 TDEL Forecast recurring old costs,9 - Costs,G46
27-28 TDEL Forecast Non Gov costs,9 - Costs,H46
27-28 TDEL Forecast Total,9 - Costs,I46
27-28 TDEL Forecast Income,9 - Costs,L46
28-29 TDEL BL one off new costs,9 - Costs,E47
28-29 TDEL BL recurring new costs,9 - Costs,F47
28-29 TDEL BL recurring old costs,9 - Costs,G47
28-29 TDEL BL Non Gov costs,9 - Costs,H47
28-29 TDEL BL Total,9 - Costs,I47
28-29 TDEL BL Income,9 - Costs,L47
28-29 TDEL Forecast one off new costs,9 - Costs,E48
28-29 TDEL Forecast recurring new costs,9 - Costs,F48
28-29 TDEL Forecast recurring old costs,9 - Costs,G48
28-29 TDEL Forecast Non Gov costs,9 - Costs,H48
28-29 TDEL Forecast Total,9 - Costs,I48
28-29 TDEL Forecast Income,9 - Costs,L48
Unprofiled TDEL BL one off new costs,9 - Costs,E49
Unprofiled TDEL BL recurring new costs,9 - Costs,F49
Unprofiled TDEL BL recurring old costs,9 - Costs,G49
Unprofiled TDEL BL Non Gov costs,9 - Costs,H49
Unprofiled TDEL BL Total,9 - Costs,I49
Unprofiled TDEL BL Income,9 - Costs,L49
Unprofiled TDEL Forecast one off new costs,9 - Costs,E50
Unprofiled TDEL Forecast recurring new costs,9 - Costs,F50
Unprofiled TDEL Forecast recurring old costs,9 - Costs,G50
Unprofiled TDEL Forecast Non Gov costs,9 - Costs,H50
Unprofiled TDEL Forecast Total,9 - Costs,I50
Unprofiled TDEL Forecast Income,9 - Costs,L50
Total TDEL BL one off new costs,9 - Costs,E51
Total TDEL BL recurring new costs,9 - Costs,F51
Total TDEL BL recurring old costs,9 - Costs,G51
Total TDEL BL Non Gov costs,9 - Costs,H51
Total TDEL BL Total,9 - Costs,I51
Total TDEL BL Income,9 - Costs,L51
Total TDEL Forecast one off new costs,9 - Costs,E52
Total TDEL Forecast recurring new costs,9 - Costs,F52
Total TDEL Forecast recurring old costs,9 - Costs,G52
Total TDEL Forecast Non Gov costs,9 - Costs,H52
Total TDEL Forecast Total,9 - Costs,I52
Total TDEL Forecast Income,9 - Costs,L52
Year TDEL spend stops,9 - Costs,E53
Pre 19-20 CDEL BL one off new costs,9 - Costs,E56
Pre 19-20 CDEL BL recurring new costs,9 - Costs,F56
Pre 19-20 CDEL BL recurring old costs,9 - Costs,G56
Pre 19-20 BL Non-Gov,9 - Costs,H56
Pre 19-20 CDEL BL WLC,9 - Costs,I56
Pre 19-20 BL Income both Revenue and Capital,9 - Costs,L56
Pre 19-20 CDEL Forecast Total,9 - Costs,E57
Pre 19-20 CDEL Forecast recurring new costs,9 - Costs,F57
Pre 19-20 CDEL Forecast recurring old costs,9 - Costs,G57
Pre 19-20 Forecast Non-Gov,9 - Costs,H57
Pre 19-20 CDEL Forecast Total WLC,9 - Costs,I57
Pre 19-20 Actual Income both Revenue and Capital,9 - Costs,L57
19-20 CDEL BL one off new costs,9 - Costs,E58
19-20 CDEL BL recurring new costs,9 - Costs,F58
19-20 CDEL BL recurring old costs,9 - Costs,G58
19-20 BL Non-Gov,9 - Costs,H58
19-20 CDEL BL WLC,9 - Costs,I58
19-20 BL Income both Revenue and Capital,9 - Costs,L58
19-20 CDEL Forecast Total,9 - Costs,E59
19-20 CDEL Forecast recurring new costs,9 - Costs,F59
19-20 CDEL Forecast recurring old costs,9 - Costs,G59
19-20 Forecast Non-Gov,9 - Costs,H59
19-20 CDEL Forecast Total WLC,9 - Costs,I59
19-20 Forecast - Income both Revenue and Capital,9 - Costs,L59
20-21 CDEL BL one off new costs,9 - Costs,E60
20-21 CDEL BL recurring new costs,9 - Costs,F60
20-21 CDEL BL recurring old costs,9 - Costs,G60
20-21 BL Non-Gov,9 - Costs,H60
20-21 CDEL BL WLC,9 - Costs,I60
20-21 BL Income both Revenue and Capital,9 - Costs,L60
20-21 CDEL Forecast Total,9 - Costs,E61
20-21 CDEL Forecast recurring new costs,9 - Costs,F61
20-21 CDEL Forecast recurring old costs,9 - Costs,G61
20-21 Forecast Non-Gov,9 - Costs,H61
20-21 CDEL Forecast Total WLC,9 - Costs,I61
20-21 Forecast - Income both Revenue and Capital,9 - Costs,L61
21-22 CDEL BL one off new costs,9 - Costs,E62
21-22 CDEL BL recurring new costs,9 - Costs,F62
21-22 CDEL BL recurring old costs,9 - Costs,G62
21-22 BL Non-Gov,9 - Costs,H62
21-22 CDEL BL WLC,9 - Costs,I62
21-22 BL - Income both Revenue and Capital,9 - Costs,L62
21-22 CDEL Forecast Total,9 - Costs,E63
21-22 CDEL Forecast recurring new costs,9 - Costs,F63
21-22 CDEL Forecast recurring old costs,9 - Costs,G63
21-22 Forecast Non-Gov,9 - Costs,H63
21-22 CDEL Forecast Total WLC,9 - Costs,I63
21-22 Forecast - Income both Revenue and Capital,9 - Costs,L63
22-23 CDEL BL one off new costs,9 - Costs,E64
22-23 CDEL BL recurring new costs,9 - Costs,F64
22-23 CDEL BL recurring old costs,9 - Costs,G64
22-23 BL Non-Gov,9 - Costs,H64
22-23 CDEL BL WLC,9 - Costs,I64
22-23 BL Income both Revenue and Capital,9 - Costs,L64
22-23 CDEL Forecast Total,9 - Costs,E65
22-23 CDEL Forecast recurring new costs,9 - Costs,F65
22-23 CDEL Forecast recurring old costs,9 - Costs,G65
22-23 Forecast Non-Gov,9 - Costs,H65
22-23 CDEL Forecast Total WLC,9 - Costs,I65
22-23 Forecast - Income both Revenue and Capital,9 - Costs,L65
23-24 CDEL BL one off new costs,9 - Costs,E66
23-24 CDEL BL recurring new costs,9 - Costs,F66
23-24 CDEL BL recurring old costs,9 - Costs,G66
23-24 BL Non-Gov,9 - Costs,H66
23-24 CDEL BL WLC,9 - Costs,I66
23-24 BL Income both Revenue and Capital,9 - Costs,L66
23-24 CDEL Forecast Total,9 - Costs,E67
23-24 CDEL Forecast recurring new costs,9 - Costs,F67
23-24 CDEL Forecast recurring old costs,9 - Costs,G67
23-24 Forecast Non-Gov,9 - Costs,H67
23-24 CDEL Forecast Total WLC,9 - Costs,I67
23-24 Forecast - Income both Revenue and Capital,9 - Costs,L67
24-25 CDEL BL one off new costs,9 - Costs,E68
24-25 CDEL BL recurring new costs,9 - Costs,F68
24-25 CDEL BL recurring old costs,9 - Costs,G68
24-25 BL Non-Gov,9 - Costs,H68
24-25 CDEL BL WLC,9 - Costs,I68
24-25 BL Income both Revenue and Capital,9 - Costs,L68
24-25 CDEL Forecast Total,9 - Costs,E69
24-25 CDEL Forecast recurring new costs,9 - Costs,F69
24-25 CDEL Forecast recurring old costs,9 - Costs,G69
24-25 Forecast Non-Gov,9 - Costs,H69
24-25 CDEL Forecast Total WLC,9 - Costs,I69
24-25 Forecast - Income both Revenue and Capital,9 - Costs,L69
25-26 CDEL BL one off new costs,9 - Costs,E70
25-26 CDEL BL recurring new costs,9 - Costs,F70
25-26 CDEL BL recurring old costs,9 - Costs,G70
25-26 BL Non-Gov,9 - Costs,H70
25-26 CDEL BL WLC,9 - Costs,I70
25-26 BL Income both Revenue and Capital,9 - Costs,L70
25-26 CDEL Forecast Total,9 - Costs,E71
25-26 CDEL Forecast recurring new costs,9 - Costs,F71
25-26 CDEL Forecast recurring old costs,9 - Costs,G71
25-26 Forecast Non-Gov,9 - Costs,H71
25-26 CDEL Forecast Total WLC,9 - Costs,I71
25-26 Forecast - Income both Revenue and Capital,9 - Costs,L71
26-27 CDEL BL one off new costs,9 - Costs,E72
26-27 CDEL BL recurring new costs,9 - Costs,F72
26-27 CDEL BL recurring old costs,9 - Costs,G72
26-27 BL Non-Gov,9 - Costs,H72
26-27 CDEL BL WLC,9 - Costs,I72
26-27 BL Income both Revenue and Capital,9 - Costs,L72
26-27 CDEL Forecast Total,9 - Costs,E73
26-27 CDEL Forecast recurring new costs,9 - Costs,F73
26-27 CDEL Forecast recurring old costs,9 - Costs,G73
26-27 Forecast Non-Gov,9 - Costs,H73
26-27 CDEL Forecast Total WLC,9 - Costs,I73
26-27 Forecast - Income both Revenue and Capital,9 - Costs,L73
27-28 CDEL BL one off new costs,9 - Costs,E74
27-28 CDEL BL recurring new costs,9 - Costs,F74
27-28 CDEL BL recurring old costs,9 - Costs,G74
27-28 BL Non-Gov,9 - Costs,H74
27-28 CDEL BL WLC,9 - Costs,I74
27-28 BL Income both Revenue and Capital,9 - Costs,L74
27-28 CDEL Forecast Total,9 - Costs,E75
27-28 CDEL Forecast recurring new costs,9 - Costs,F75
27-28 CDEL Forecast recurring old costs,9 - Costs,G75
27-28 Forecast Non-Gov,9 - Costs,H75
27-28 CDEL Forecast Total WLC,9 - Costs,I75
27-28 Forecast - Income both Revenue and Capital,9 - Costs,L75
28-29 CDEL BL one off new costs,9 - Costs,E76
28-29 CDEL BL recurring new costs,9 - Costs,F76
28-29 CDEL BL recurring old costs,9 - Costs,G76
28-29 BL Non-Gov,9 - Costs,H76
28-29 CDEL BL WLC,9 - Costs,I76
28-29 BL Income both Revenue and Capital,9 - Costs,L76
28-29 CDEL Forecast Total,9 - Costs,E77
28-29 CDEL Forecast recurring new costs,9 - Costs,F77
28-29 CDEL Forecast recurring old costs,9 - Costs,G77
28-29 Forecast Non-Gov,9 - Costs,H77
28-29 CDEL Forecast Total WLC,9 - Costs,I77
28-29 Forecast - Income both Revenue and Capital,9 - Costs,L77
Unprofiled CDEL BL one off new costs,9 - Costs,E78
Unprofiled CDEL BL recurring new costs,9 - Costs,F78
Unprofiled CDEL BL recurring old costs,9 - Costs,G78
Unprofiled BL Non-Gov,9 - Costs,H78
Unprofiled CDEL BL WLC,9 - Costs,I78
Unprofiled BL Income,9 - Costs,L78
Unprofiled CDEL Forecast Total,9 - Costs,E79
Unprofiled CDEL Forecast recurring new costs,9 - Costs,F79
Unprofiled CDEL Forecast recurring old costs,9 - Costs,G79
Unprofiled Forecast-Gov,9 - Costs,H79
Unprofiled CDEL Forecast Total WLC,9 - Costs,I79
Unprofiled Forecast Income,9 - Costs,L79
Total CDEL BL one off new costs,9 - Costs,E80
Total CDEL BL recurring new costs,9 - Costs,F80
Total CDEL BL recurring old costs,9 - Costs,G80
Non-Gov Total Budget/BL,9 - Costs,H80
Total CDEL BL WLC,9 - Costs,I80
Total Bobline - Income both Revenue and Capital,9 - Costs,L80
Total CDEL Forecast Total,9 - Costs,E81
Total CDEL Forecast recurring new costs,9 - Costs,F81
Total CDEL Forecast recurring old costs,9 - Costs,G81
Non-Gov Total Forecast,9 - Costs,H81
Total CDEL Forecast Total WLC,9 - Costs,I81
Total Forecast - Income both Revenue and Capital,9 - Costs,L81
Year CDEL spend stops,9 - Costs,E82
SRO Finance confidence,9 - Costs,E118
Benefits Narrative,10 - Benefits,E6
Ben comparison with last quarters cost - narrative ,10 - Benefits,E7
Ben comparison within this quarters cost - narrative ,10 - Benefits,E8
Narrative on any project Non-Monetised benefits,10 - Benefits,E9
"If benefits profile (by years) not provided, please provide reason and date for when they will be",10 - Benefits,E10
Pre 19-20 BEN Bobline - Gov. Cashable,10 - Benefits,E25
Pre 19-20 BEN Bobline - Gov. Non-Cashable,10 - Benefits,F25
Pre 19-20 BEN Bobline - Economic (inc Private Partner),10 - Benefits,G25
Pre 19-20 BEN Bobline - Disbenefit UK Economic,10 - Benefits,H25
Pre 19-20 BEN Bobline - Total Monetised Benefits,10 - Benefits,K25
Pre 19-20 BEN Forecast - Gov. Cashable,10 - Benefits,E26
Pre 19-20 BEN Forecast - Gov. Non-Cashable,10 - Benefits,F26
Pre 19-20 BEN Forecast - Economic (inc Private Partner),10 - Benefits,G26
Pre 19-20 BEN Forecast - Disbenefit UK Economic,10 - Benefits,H26
Pre 19-20 BEN Forecast - Total Monetised Benefits,10 - Benefits,K26
19-20 BEN Bobline - Gov. Cashable,10 - Benefits,E27
19-20 BEN Bobline - Gov. Non-Cashable,10 - Benefits,F27
19-20 BEN Bobline - Economic (inc Private Partner),10 - Benefits,G27
19-20 BEN Bobline - Disbenefit UK Economic,10 - Benefits,H27
19-20 BEN Bobline - Total Monetised Benefits,10 - Benefits,K27
19-20 BEN Forecast - Gov. Cashable,10 - Benefits,E28
19-20 BEN Forecast - Gov. Non-Cashable,10 - Benefits,F28
19-20 BEN Forecast - Economic (inc Private Partner),10 - Benefits,G28
19-20 BEN Forecast - Disbenefit UK Economic,10 - Benefits,H28
19-20 BEN Forecast - Total Monetised Benefits,10 - Benefits,K28
20-21 BEN Bobline - Gov. Cashable,10 - Benefits,E29
20-21 BEN Bobline - Gov. Non-Cashable,10 - Benefits,F29
20-21 BEN Bobline - Economic (inc Private Partner),10 - Benefits,G29
20-21 BEN Bobline - Disbenefit UK Economic,10 - Benefits,H29
20-21 BEN Bobline - Total Monetised Benefits,10 - Benefits,K29
20-21 BEN Forecast - Gov. Cashable,10 - Benefits,E30
20-21 BEN Forecast - Gov. Non-Cashable,10 - Benefits,F30
20-21 BEN Forecast - Economic (inc Private Partner),10 - Benefits,G30
20-21 BEN Forecast - Disbenefit UK Economic,10 - Benefits,H30
20-21 BEN Forecast - Total Monetised Benefits,10 - Benefits,K30
21-22 BEN Bobline - Gov. Cashable,10 - Benefits,E31
21-22 BEN Bobline - Gov. Non-Cashable,10 - Benefits,F31
21-22 BEN Bobline - Economic (inc Private Partner),10 - Benefits,G31
21-22 BEN Bobline - Disbenefit UK Economic,10 - Benefits,H31
21-22 BEN Bobline - Total Monetised Benefits,10 - Benefits,K31
21-22 BEN Forecast - Gov. Cashable,10 - Benefits,E32
21-22 BEN Forecast - Gov. Non-Cashable,10 - Benefits,F32
21-22 BEN Forecast - Economic (inc Private Partner),10 - Benefits,G32
21-22 BEN Forecast - Disbenefit UK Economic,10 - Benefits,H32
21-22 BEN Forecast - Total Monetised Benefits,10 - Benefits,K32
22-23 BEN Bobline - Gov. Cashable,10 - Benefits,E33
22-23 BEN Bobline - Gov. Non-Cashable,10 - Benefits,F33
22-23 BEN Bobline - Economic (inc Private Partner),10 - Benefits,G33
22-23 BEN Bobline - Disbenefit UK Economic,10 - Benefits,H33
22-23 BEN Bobline - Total Monetised Benefits,10 - Benefits,K33
22-23 BEN Forecast - Gov. Cashable,10 - Benefits,E34
22-23 BEN Forecast - Gov. Non-Cashable,10 - Benefits,F34
22-23 BEN Forecast - Economic (inc Private Partner),10 - Benefits,G34
22-23 BEN Forecast - Disbenefit UK Economic,10 - Benefits,H34
22-23 BEN Forecast - Total Monetised Benefits,10 - Benefits,K34
23-24 BEN Bobline - Gov. Cashable,10 - Benefits,E35
23-24 BEN Bobline - Gov. Non-Cashable,10 - Benefits,F35
23-24 BEN Bobline - Economic (inc Private Partner),10 - Benefits,G35
23-24 BEN Bobline - Disbenefit UK Economic,10 - Benefits,H35
23-24 BEN Bobline - Total Monetised Benefits,10 - Benefits,K35
23-24 BEN Forecast - Gov. Cashable,10 - Benefits,E36
23-24 BEN Forecast - Gov. Non-Cashable,10 - Benefits,F36
23-24 BEN Forecast - Economic (inc Private Partner),10 - Benefits,G36
23-24 BEN Forecast - Disbenefit UK Economic,10 - Benefits,H36
23-24 BEN Forecast - Total Monetised Benefits,10 - Benefits,K36
24-25 BEN Bobline - Gov. Cashable,10 - Benefits,E37
24-25 BEN Bobline - Gov. Non-Cashable,10 - Benefits,F37
24-25 BEN Bobline - Economic (inc Private Partner),10 - Benefits,G37
24-25 BEN Bobline - Disbenefit UK Economic,10 - Benefits,H37
24-25 BEN Bobline - Total Monetised Benefits,10 - Benefits,K37
24-25 BEN Forecast - Gov. Cashable,10 - Benefits,E38
24-25 BEN Forecast - Gov. Non-Cashable,10 - Benefits,F38
24-25 BEN Forecast - Economic (inc Private Partner),10 - Benefits,G38
24-25 BEN Forecast - Disbenefit UK Economic,10 - Benefits,H38
24-25 BEN Forecast - Total Monetised Benefits,10 - Benefits,K38
25-26 BEN Bobline - Gov. Cashable,10 - Benefits,E39
25-26 BEN Bobline - Gov. Non-Cashable,10 - Benefits,F39
25-26 BEN Bobline - Economic (inc Private Partner),10 - Benefits,G39
25-26 BEN Bobline - Disbenefit UK Economic,10 - Benefits,H39
25-26 BEN Bobline - Total Monetised Benefits,10 - Benefits,K39
25-26 BEN Forecast - Gov. Cashable,10 - Benefits,E40
25-26 BEN Forecast - Gov. Non-Cashable,10 - Benefits,F40
25-26 BEN Forecast - Economic (inc Private Partner),10 - Benefits,G40
25-26 BEN Forecast - Disbenefit UK Economic,10 - Benefits,H40
25-26 BEN Forecast - Total Monetised Benefits,10 - Benefits,K40
26-27 BEN Bobline - Gov. Cashable,10 - Benefits,E41
26-27 BEN Bobline - Gov. Non-Cashable,10 - Benefits,F41
26-27 BEN Bobline - Economic (inc Private Partner),10 - Benefits,G41
26-27 BEN Bobline - Disbenefit UK Economic,10 - Benefits,H41
26-27 BEN Bobline - Total Monetised Benefits,10 - Benefits,K41
26-27 BEN Forecast - Gov. Cashable,10 - Benefits,E42
26-27 BEN Forecast - Gov. Non-Cashable,10 - Benefits,F42
26-27 BEN Forecast - Economic (inc Private Partner),10 - Benefits,G42
26-27 BEN Forecast - Disbenefit UK Economic,10 - Benefits,H42
26-27 BEN Forecast - Total Monetised Benefits,10 - Benefits,K42
27-28 BEN Bobline - Gov. Cashable,10 - Benefits,E43
27-28 BEN Bobline - Gov. Non-Cashable,10 - Benefits,F43
27-28 BEN Bobline - Economic (inc Private Partner),10 - Benefits,G43
27-28 BEN Bobline - Disbenefit UK Economic,10 - Benefits,H43
27-28 BEN Bobline - Total Monetised Benefits,10 - Benefits,K43
27-28 BEN Forecast - Gov. Cashable,10 - Benefits,E44
27-28 BEN Forecast - Gov. Non-Cashable,10 - Benefits,F44
27-28 BEN Forecast - Economic (inc Private Partner),10 - Benefits,G44
27-28 BEN Forecast - Disbenefit UK Economic,10 - Benefits,H44
27-28 BEN Forecast - Total Monetised Benefits,10 - Benefits,K44
28-29 BEN Bobline - Gov. Cashable,10 - Benefits,E45
28-29 BEN Bobline - Gov. Non-Cashable,10 - Benefits,F45
28-29 BEN Bobline - Economic (inc Private Partner),10 - Benefits,G45
28-29 BEN Bobline - Disbenefit UK Economic,10 - Benefits,H45
28-29 BEN Bobline - Total Monetised Benefits,10 - Benefits,K45
28-29 BEN Forecast - Gov. Cashable,10 - Benefits,E46
28-29 BEN Forecast - Gov. Non-Cashable,10 - Benefits,F46
28-29 BEN Forecast - Economic (inc Private Partner),10 - Benefits,G46
28-29 BEN Forecast - Disbenefit UK Economic,10 - Benefits,H46
28-29 BEN Forecast - Total Monetised Benefits,10 - Benefits,K46
Unprofiled Remainder BEN Bobline - Gov. Cashable,10 - Benefits,E47
Unprofiled Remainder BEN Bobline - Gov. Non-Cashable,10 - Benefits,F47
Unprofiled Remainder BEN Bobline - Economic (inc Private Partner),10 - Benefits,G47
Unprofiled Remainder BEN Bobline - Disbenefit UK Economic,10 - Benefits,H47
Unprofiled Remainder BEN Bobline - Total Monetised Benefits,10 - Benefits,K47
Unprofiled Remainder BEN Forecast - Gov. Cashable,10 - Benefits,E48
Unprofiled Remainder BEN Forecast - Gov. Non-Cashable,10 - Benefits,F48
Unprofiled Remainder BEN Forecast - Economic (inc Private Partner),10 - Benefits,G48
Unprofiled Remainder BEN Forecast - Disbenefit UK Economic,10 - Benefits,H48
Unprofiled Remainder BEN Forecast - Total Monetised Benefits,10 - Benefits,K48
Total BEN Bobline - Gov. Cashable,10 - Benefits,E49
Total BEN Bobline - Gov. Non-Cashable,10 - Benefits,F49
Total BEN Bobline - Economic (inc Private Partner),10 - Benefits,G49
Total BEN Bobline - Disbenefit UK Economic,10 - Benefits,H49
Total BEN Bobline - Total Monetised Benefits,10 - Benefits,K49
Total BEN Forecast - Gov. Cashable,10 - Benefits,E50
Total BEN Forecast - Gov. Non-Cashable,10 - Benefits,F50
Total BEN Forecast - Economic (inc Private Partner),10 - Benefits,G50
Total BEN Forecast - Disbenefit UK Economic,10 - Benefits,H50
Total BEN Forecast - Total Monetised Benefits,10 - Benefits,K50
Year BEN spend stops,10 - Benefits,E51
No Deductions - Net Benefits Provided,10 - Benefits,K54
Deduct TDEL One Off New Costs?,10 - Benefits,K55
Deduct CDEL one off New Costs?,10 - Benefits,K56
Deduct TDEL Recurring New Costs?,10 - Benefits,K57
Deduct CDEL Recurring New Costs?,10 - Benefits,K58
Deduct TDEL Recurring Old Costs?,10 - Benefits,K59
Deduct CDEL Recurring Old Costs?,10 - Benefits,K60
No Monetised Benefits / Initial Business Case Being Prepared,10 - Benefits,K61
SRO Benefits RAG,10 - Benefits,E64