{% extends "base_stakeholder.html" %} {% load static %} {% block content %}
{{ org.person_set.first }}
THIS IS A TEMPLATE FOR A STAKEHOLDER USER
Please note that important notices go in here. This is the NIS Directive portal for DfT. Etc.
Your lead inspector is Bob McKinnon.
Other important messages will appear here when we deem it necessary. Please ensure you remain in touch with what appears in this box because it WILL be updated periodically.
Help | NIS Regulations | Improvement Plan Information | Report a problemIncident | Date | Details | Status |
---|---|---|---|
Power failure at Random Site | 12 May 2020 | There was a problem with some wires inside the black box at the site. There was very little we could do until someone switched the circuit breakers off, then we had to switch off the server that supplies the TLS link to the estate management system. We failed on this one, big time. | UNRESOLVED |
Corruption of main database | 8 December 2019 | Weather got to the night-watchperson, who typed in the command to seal the compound incorrectly. This led to a deluge of sand into the minky processor which eventually wiped all data tables. | RESOLVED |
Date | Type | Location | Notes | CAF scope | Status | Report |
---|---|---|---|---|---|---|
23 October 2020 | Inspection | Hammersmith | Follow up to July call | A2.c B2.a | SCHEDULED | |
5 June 2020 | Audit | Hammersmith | NA | A2.c B5.c B6 B7 | RESOLVED | DfT-NIS-2302A |
19 January 2020 | Meeting | Video | NA | Obj C | RESOLVED | |
System Name | Description | CAF |
---|---|---|
{{ system.name }} | {{ system.description }} | {{ system.caf }} | Update WebCAF |
No engagement with DfT currently scheduled